{"id":74257,"date":"2011-08-26T14:21:38","date_gmt":"2011-08-26T14:21:38","guid":{"rendered":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/article\/precast-refuge_o-2"},"modified":"2011-08-26T14:21:38","modified_gmt":"2011-08-26T14:21:38","slug":"precast-refuge_o-2","status":"publish","type":"post","link":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o\/","title":{"rendered":"Precast refuge"},"content":{"rendered":"<div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\"> <\/div><div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\"> <p class=\"wp-block-paragraph\">Remote and virtually undisturbed, the Upper Mississippi River National Wildlife and Fish Refuge boasts a bounty of flora and fauna, both common and rare species that thrive in the largest delta floodplain in the Upper Midwest.<\/p> <p class=\"wp-block-paragraph\">At the northern edge of this wilderness, near the confluence of the Chippewa and Mississippi rivers, is the Nelson-Trevino Bottoms State Natural Area: 3,740 acres of forested floodplains, marshes, sloughs, and ponds.<\/p> <p class=\"wp-block-paragraph\">Wisconsin State Route 25 bisects the area and is the only connection between Wisconsin and Minnesota for 30 miles. The highway is vital for area residents, as the nearest grocery store is 4 miles across the river in Wabasha, Minn.<\/p> <p class=\"wp-block-paragraph\">To maintain that link, in 2009 the Wisconsin DOT (WisDOT) began a $10 million, 15-month project to replace three bridges and rehabilitate a fourth one in the area. The agency also received additional funding for the project through the federal Highways for Life program.<\/p> <p class=\"wp-block-paragraph\">For this project, academia teamed with precast producers The Spancrete Group Inc., of Waukesha, Wis., and County Materials Corp., of Marathon, Wis. Michael Oliva, a University of Wisconsin professor of civil and environmental engineering, worked with WisDOT engineers and the two pre-cast producers to develop standards for precast spans.<\/p> <p class=\"wp-block-paragraph\">Oliva&#8217;s recent work has focused on earthquake resistance of precast concrete systems. He&#8217;s developing improved methods for highway bridge design and rapid construction to improve work zone safety and reduce impact on motorists.<\/p> <p class=\"wp-block-paragraph\">In 2008, WisDOT used precast abutments for the first time on a bridge near Baldwin, Wis., that were developed with Oliva and his students.<\/p> <p class=\"wp-block-paragraph\">Now, two of the seven-span, 544-foot Route 25 bridges are the first in the state to use precast concrete pier caps to support the bridge girders.<\/p> <p class=\"wp-block-paragraph\">\u201cThe bridges provided span lengths where open-pile-bent piers could be used, minimizing the footprint of the piers in the Mississippi River slough and decreasing the time required to construct the piers,\u201d says Michael Williams, a consulting engineer with the WisDOT Bureau of Structures.<\/p><p class=\"wp-block-paragraph\"><b>The right connection<\/b> <\/p> <p class=\"wp-block-paragraph\">One of the most important aspects of using precast components is connecting them, says Oliva, who&#8217;s studied connection methods worldwide and has developed several of his own.<\/p> <p class=\"wp-block-paragraph\">Because of the need for environmental sensitivity, crews split the pre-cast pier caps in half to lower their weight and reduce the size of the crane needed to handle them. Placed atop the piles, the halves fit like a 3-D puzzle, with overlapping lap-ship joints skewered with steel pins. Steel dowels grouted in place also secure the pier caps to the piles.<\/p> <p class=\"wp-block-paragraph\">Oliva sees precast concrete as the material of choice for future projects.<\/p> <p class=\"wp-block-paragraph\">\u201cOur goal is to build a bridge in a week or two rather than in three or four months,\u201d he says.<\/p> <p class=\"wp-block-paragraph\"><i>\u2014 Originally published by the University of Wisconsin-Madison News Service, this article appeared in the April\/May 2011 issue of<\/i> THE CONCRETE PRODUCER<i>, a sister magazine of<\/i> PUBLIC WORKS.<\/p><\/div> ","protected":false},"excerpt":{"rendered":"<p>Remote and virtually undisturbed, the Upper Mississippi River National Wildlife and Fish Refuge boasts a bounty of flora and fauna, both common and rare species that thrive in the largest delta floodplain in the Upper Midwest. At the northern edge of this wilderness, near the confluence of the Chippewa and Mississippi rivers, is the Nelson-Trevino [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":74260,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"scheduledNewsletterDates":[],"_scheduled_newsletter_id":0,"footnotes":"","jetpack_post_was_ever_published":false,"zonda_content_type_url_append":"_o","zonda_dfp_zone":"","zonda_exclude_recommended_contents":false,"zonda_exclude_most_popular":false,"zonda_exclude_tagged_results":false,"zonda_eyebrow":"Bridges & Culverts","zonda_last_newsletter_date":"2099-12-31T23:59:59.999-05:00","zonda_original_url":"","zonda_pdf_version":0,"zonda_print_headline":"Precast refuge","zonda_promo_abstract":"Wisconsin implements a method for building a bridge within two weeks.","zonda_promo_headline":"","zonda_promo_image":0,"zonda_subheadline":"Wisconsin implements a method for building a bridge within two weeks."},"tags":[],"news_item_type":[780],"section_10":[83124],"subject":[581,399,2333],"organization":[1964,1159],"award":[],"person":[],"product_type_10":[],"content-group":[],"event":[],"location":[7112,1782],"state":[686],"brand":[21460],"jlc-category":[],"year_tax":[],"sponsor":[],"coauthors":[17850],"class_list":["post-74257","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","news_item_type-feature","section_10-infrastructure","subject-bridges-and-culverts","subject-infrastructure-projects","subject-precast-concrete","organization-delta","organization-midwest-snips","location-madison-wi","location-mankato-north-mankato-mn","state-wisconsin","brand-public-works"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.2 (Yoast SEO v28.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Precast refuge<\/title>\n<meta name=\"description\" content=\"Wisconsin implements a method for building a bridge within two weeks.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Precast refuge\" \/>\n<meta property=\"og:description\" content=\"Wisconsin implements a method for building a bridge within two weeks.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o\/\" \/>\n<meta property=\"og:site_name\" content=\"Concrete Construction Magazine\" \/>\n<meta property=\"article:published_time\" content=\"2011-08-26T14:21:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2011\/tmpf1-2etmp-tcm111-1355427.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"300\" \/>\n\t<meta property=\"og:image:height\" content=\"196\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n\t<meta name=\"twitter:label2\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data2\" content=\"Public Works Staff\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/precast-refuge_o#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/precast-refuge_o\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Precast refuge\",\"datePublished\":\"2011-08-26T14:21:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/precast-refuge_o\\\/\"},\"wordCount\":476,\"image\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/precast-refuge_o#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2011\\\/tmpf1-2etmp-tcm111-1355427.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/precast-refuge_o\\\/\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/precast-refuge_o\",\"name\":\"Precast refuge\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/precast-refuge_o#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/precast-refuge_o#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2011\\\/tmpf1-2etmp-tcm111-1355427.jpg\",\"datePublished\":\"2011-08-26T14:21:38+00:00\",\"author\":{\"@id\":\"\"},\"description\":\"Wisconsin implements a method for building a bridge within two weeks.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/precast-refuge_o#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/precast-refuge_o\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/precast-refuge_o#primaryimage\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2011\\\/tmpf1-2etmp-tcm111-1355427.jpg\",\"contentUrl\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2011\\\/tmpf1-2etmp-tcm111-1355427.jpg\",\"width\":300,\"height\":196,\"caption\":\"A crew sets a two-piece precast concrete pier cap into position on the State Route 25 Bridge, which bisects the Upper Mississippi National Wildlife and Fish Refuge.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/precast-refuge_o#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Precast refuge\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/#website\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/\",\"name\":\"Concrete Construction Magazine\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Precast refuge","description":"Wisconsin implements a method for building a bridge within two weeks.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o","og_locale":"en_US","og_type":"article","og_title":"Precast refuge","og_description":"Wisconsin implements a method for building a bridge within two weeks.","og_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o\/","og_site_name":"Concrete Construction Magazine","article_published_time":"2011-08-26T14:21:38+00:00","og_image":[{"width":300,"height":196,"url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2011\/tmpf1-2etmp-tcm111-1355427.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes","Written by":"Public Works Staff"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o#article","isPartOf":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o\/"},"author":{"name":"","@id":""},"headline":"Precast refuge","datePublished":"2011-08-26T14:21:38+00:00","mainEntityOfPage":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o\/"},"wordCount":476,"image":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o#primaryimage"},"thumbnailUrl":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2011\/tmpf1-2etmp-tcm111-1355427.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o\/","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o","name":"Precast refuge","isPartOf":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o#primaryimage"},"image":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o#primaryimage"},"thumbnailUrl":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2011\/tmpf1-2etmp-tcm111-1355427.jpg","datePublished":"2011-08-26T14:21:38+00:00","author":{"@id":""},"description":"Wisconsin implements a method for building a bridge within two weeks.","breadcrumb":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o#primaryimage","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2011\/tmpf1-2etmp-tcm111-1355427.jpg","contentUrl":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2011\/tmpf1-2etmp-tcm111-1355427.jpg","width":300,"height":196,"caption":"A crew sets a two-piece precast concrete pier cap into position on the State Route 25 Bridge, which bisects the Upper Mississippi National Wildlife and Fish Refuge."},{"@type":"BreadcrumbList","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/precast-refuge_o#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/"},{"@type":"ListItem","position":2,"name":"Precast refuge"}]},{"@type":"WebSite","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/#website","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/","name":"Concrete Construction Magazine","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"jetpack_sharing_enabled":true,"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Concrete Construction Magazine","distributor_original_site_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction","push-errors":false,"jetpack_featured_media_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2011\/tmpf1-2etmp-tcm111-1355427.jpg","_links":{"self":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts\/74257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/comments?post=74257"}],"version-history":[{"count":0,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts\/74257\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/media\/74260"}],"wp:attachment":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/media?parent=74257"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/tags?post=74257"},{"taxonomy":"news_item_type","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/news_item_type?post=74257"},{"taxonomy":"section_10","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/section_10?post=74257"},{"taxonomy":"subject","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/subject?post=74257"},{"taxonomy":"organization","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/organization?post=74257"},{"taxonomy":"award","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/award?post=74257"},{"taxonomy":"person","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/person?post=74257"},{"taxonomy":"product_type_10","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/product_type_10?post=74257"},{"taxonomy":"content-group","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/content-group?post=74257"},{"taxonomy":"event","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/event?post=74257"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/location?post=74257"},{"taxonomy":"state","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/state?post=74257"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/brand?post=74257"},{"taxonomy":"jlc-category","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/jlc-category?post=74257"},{"taxonomy":"year_tax","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/year_tax?post=74257"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/sponsor?post=74257"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/coauthors?post=74257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}