{"id":69785,"date":"2012-10-11T14:46:01","date_gmt":"2012-10-11T14:46:01","guid":{"rendered":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/article\/construction-project-collaboration-software_o"},"modified":"2012-10-11T14:46:01","modified_gmt":"2012-10-11T14:46:01","slug":"construction-project-collaboration-software_o","status":"publish","type":"post","link":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o\/","title":{"rendered":"Construction Project Collaboration Software"},"content":{"rendered":"\n\n<div class=\"image-carousel\"\n\trole=\"region\"\n\taria-roledescription=\"carousel\"\n\taria-label=\"Image carousel\"\n\tdata-total-slides=\"4\"\n\t>\n\n\t<div class=\"image-carousel-top\">\n\t\t\n\t\t<div class=\"carousel-counter\">\n\t\t\t<span class=\"current-index\">1<\/span>\n\t\t\tof\t\t\t<span class=\"total-count\">4<\/span>\n\t\t<\/div>\n\t<\/div>\n\n\t<div class=\"image-carousel__hero-wrapper\">\n\t\t<button class=\"carousel-prev\"\n\t\t\t\taria-label=\"Previous slide\"\n\t\t\t\ttype=\"button\">\n\t\t\t<span class=\"icon\" aria-hidden=\"true\"><\/span>\n\t\t<\/button>\n\n\t\t<div class=\"carousel-main\" aria-live=\"polite\">\n\t\t\t\t\t\t\t<div class=\"carousel-slide active\"\n\t\t\t\t\tid=\"carousel-slide-0\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 1 of 4\"\n\t\t\t\t\taria-hidden=\"false\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Load the first image immediately at full size -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f62-2etmp-tcm45-1585226.jpg?w=642\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f62-2etmp-tcm45-1585226.jpg 2000w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f62-2etmp-tcm45-1585226.jpg?resize=300,171 300w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f62-2etmp-tcm45-1585226.jpg?resize=768,439 768w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f62-2etmp-tcm45-1585226.jpg?resize=1024,585 1024w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f62-2etmp-tcm45-1585226.jpg?resize=1536,878 1536w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f62-2etmp-tcm45-1585226.jpg?resize=642,367 642w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f62-2etmp-tcm45-1585226.jpg?resize=310,177 310w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f62-2etmp-tcm45-1585226.jpg?resize=199,114 199w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f62-2etmp-tcm45-1585226.jpg?resize=229,131 229w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 642px) 100vw, 642px\"\n\t\t\t\t\t\t\talt=\"Collaboration software is a direct connection for the entire project team to current project information.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"Collaboration software is a direct connection for the entire project team to current project information.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Bentley Systems\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"carousel-slide hidden\"\n\t\t\t\t\tid=\"carousel-slide-1\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 2 of 4\"\n\t\t\t\t\taria-hidden=\"true\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Lazy load other main images with data-src to be loaded only when needed -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f64-2etmp-tcm45-1585238.jpg?w=244\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f64-2etmp-tcm45-1585238.jpg 2000w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f64-2etmp-tcm45-1585238.jpg?resize=200,300 200w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f64-2etmp-tcm45-1585238.jpg?resize=768,1153 768w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f64-2etmp-tcm45-1585238.jpg?resize=682,1024 682w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f64-2etmp-tcm45-1585238.jpg?resize=1023,1536 1023w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f64-2etmp-tcm45-1585238.jpg?resize=1364,2048 1364w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f64-2etmp-tcm45-1585238.jpg?resize=244,367 244w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f64-2etmp-tcm45-1585238.jpg?resize=118,177 118w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f64-2etmp-tcm45-1585238.jpg?resize=76,114 76w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f64-2etmp-tcm45-1585238.jpg?resize=87,131 87w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 244px) 100vw, 244px\"\n\t\t\t\t\t\t\talt=\"Coloscapes Concrete, Windsor, Colo., relies on handheld mobile devices and ProContractorMX to manage its projects.\"\n\t\t\t\t\t\t\tclass=\"lazy-load-image\"\n\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"Coloscapes Concrete, Windsor, Colo., relies on handheld mobile devices and ProContractorMX to manage its projects.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Anthony Camera\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"carousel-slide hidden\"\n\t\t\t\t\tid=\"carousel-slide-2\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 3 of 4\"\n\t\t\t\t\taria-hidden=\"true\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Lazy load other main images with data-src to be loaded only when needed -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg?w=551\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg 2000w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg?resize=300,200 300w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg?resize=768,512 768w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg?resize=1024,682 1024w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg?resize=1536,1024 1536w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg?resize=551,367 551w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg?resize=266,177 266w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg?resize=171,114 171w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg?resize=197,131 197w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg?resize=160,107 160w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 551px) 100vw, 551px\"\n\t\t\t\t\t\t\talt=\"This large complex project was maanged more efficiently with collaboration software.\"\n\t\t\t\t\t\t\tclass=\"lazy-load-image\"\n\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"This large complex project was maanged more efficiently with collaboration software.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"EADOC\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"carousel-slide hidden\"\n\t\t\t\t\tid=\"carousel-slide-3\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 4 of 4\"\n\t\t\t\t\taria-hidden=\"true\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Lazy load other main images with data-src to be loaded only when needed -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f66-2etmp-tcm45-1585248.jpg?w=294\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f66-2etmp-tcm45-1585248.jpg 2000w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f66-2etmp-tcm45-1585248.jpg?resize=240,300 240w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f66-2etmp-tcm45-1585248.jpg?resize=768,960 768w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f66-2etmp-tcm45-1585248.jpg?resize=819,1024 819w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f66-2etmp-tcm45-1585248.jpg?resize=1229,1536 1229w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f66-2etmp-tcm45-1585248.jpg?resize=1638,2048 1638w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f66-2etmp-tcm45-1585248.jpg?resize=294,367 294w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f66-2etmp-tcm45-1585248.jpg?resize=142,177 142w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f66-2etmp-tcm45-1585248.jpg?resize=91,114 91w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f66-2etmp-tcm45-1585248.jpg?resize=105,131 105w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 294px) 100vw, 294px\"\n\t\t\t\t\t\t\talt=\"Access to current information via handheld devices ties field and office together seamlessly.\"\n\t\t\t\t\t\t\tclass=\"lazy-load-image\"\n\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"Access to current information via handheld devices ties field and office together seamlessly.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Maxwell Systems\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\t<button class=\"carousel-next\"\n\t\t\t\taria-label=\"Next slide\"\n\t\t\t\ttype=\"button\">\n\t\t\t<span class=\"icon\" aria-hidden=\"true\"><\/span>\n\t\t<\/button>\n\t<\/div>\n\n\t<div class=\"carousel-captions-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption active\"\n\t\t\t\t\tid=\"carousel-caption-0\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Bentley Systems<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"Collaboration software is a direct connection for the entire project team to current project information.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tCollaboration software is a direct connection for the entire pro&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-0\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-0\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tCollaboration software is a direct connection for the entire project team to current project information.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption hidden\"\n\t\t\t\t\tid=\"carousel-caption-1\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Anthony Camera<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"Coloscapes Concrete, Windsor, Colo., relies on handheld mobile devices and ProContractorMX to manage its projects.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tColoscapes Concrete, Windsor, Colo., relies on handheld mobile d&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-1\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-1\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tColoscapes Concrete, Windsor, Colo., relies on handheld mobile devices and ProContractorMX to manage its projects.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption hidden\"\n\t\t\t\t\tid=\"carousel-caption-2\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">EADOC<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"This large complex project was maanged more efficiently with collaboration software.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tThis large complex project was maanged more efficiently with col&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-2\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-2\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tThis large complex project was maanged more efficiently with collaboration software.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption hidden\"\n\t\t\t\t\tid=\"carousel-caption-3\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Maxwell Systems<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"Access to current information via handheld devices ties field and office together seamlessly.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tAccess to current information via handheld devices ties field an&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-3\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-3\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tAccess to current information via handheld devices ties field and office together seamlessly.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\n\t<div class=\"carousel-thumbnails-wrapper\" role=\"tablist\" aria-label=\"Thumbnail navigation\">\n\t\t<div class=\"carousel-thumbnails\">\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper active\"\n\t\t\t\t\t\tdata-index=\"0\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 1\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-1\"\n\t\t\t\t\t\taria-selected=\"true\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f62-2etmp-tcm45-1585226.jpg?w=150&#038;h=150&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper \"\n\t\t\t\t\t\tdata-index=\"1\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 2\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-2\"\n\t\t\t\t\t\taria-selected=\"false\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f64-2etmp-tcm45-1585238.jpg?w=150&#038;h=150&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper \"\n\t\t\t\t\t\tdata-index=\"2\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 3\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-3\"\n\t\t\t\t\t\taria-selected=\"false\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg?w=150&#038;h=150&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper \"\n\t\t\t\t\t\tdata-index=\"3\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 4\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-4\"\n\t\t\t\t\t\taria-selected=\"false\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f66-2etmp-tcm45-1585248.jpg?w=150&#038;h=150&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t<\/div>\n\t<\/div>\n\n\t<\/div>\n<p class=\"wp-block-paragraph\">Collaboration may be one of those buzz words\u2014like paradigm or synergy\u2014that, for the sake of clear communication\u2014should be avoided. But a new kind of software that has emerged under the general description of project collaboration has features that make it worth knowing about.<\/p><p class=\"wp-block-paragraph\">Think of collaborative construction management software as enhanced project management software that pulls in all of the players on a project. Collaboration software keeps all project information in one place and controls who has access and who has made changes. Everything from bids to submittals to drawings and invoices are available to those who have been given permission and everything is routed to the proper people for approvals.<\/p><p class=\"wp-block-paragraph\">The various companies that have developed entries into this class of software have come at it from different angles. Dexter + Chaney\u2019s Venture collaboration software evolved from its project management package. Bentley\u2019s ProjectWise starts from the designer\u2019s viewpoint, but gets to the same place. EADOC came from project management software and extends it to collaborate across a project. Gehry Technologies and its GTeam is more of a platform for sharing design models (BIM) than a complete collaboration package, but it is evolving in that direction. AEC-Sync is a web-based collaboration package recently acquired from Attolist by Newforma; it is now being marketed under the name Newforma Project Cloud and appears to be a full-service product. But if all you\u2019re worried about is controlling your own company, these packages are probably more than you\u2019re looking for and you might want to stick with project management software like Maxwell\u2019s ProContractorMX (see bottom of the article).<\/p><h3 class=\"wp-block-heading\">Sharing documents<\/h3><div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">  <div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\"> <h3 class=\"wp-block-heading\">Connecting the Office and the Field<\/h3> <div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">  <img decoding=\"async\" src=\"http:\/\/cdnassets.hw.net\/dims4\/GG\/e432d54\/2147483647\/resize\/150x\/quality\/90\/?url=http%3A%2F%2Fcdnassets.hw.net%2Ff7%2Fda%2F93210bd344989cc26a82bf6922bf%2Ftmp4f66-2etmp-tcm45-1585248.jpg\" alt=\"Access to current information via handheld devices ties field and office together seamlessly.\">  <div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">  <p class=\"wp-block-paragraph\">Access to current information via handheld devices ties field and office together seamlessly.<\/p>  <\/div>  <p class=\"wp-block-paragraph\">Credit: Maxwell Systems<\/p> <\/div> <div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">  <p class=\"wp-block-paragraph\">Collaborating throughout the construction process is imperative for achieving optimum profit. Every person involved in a project, at any phase, must be able to communicate easily and in real time. E.R. Lewis Construction Co., Greenville, N.C., has put that notion into action. To improve collaboration across the company, E.R. Lewis chose Maxwell Systems\u2019 ProContractorMX construction management software that brings together estimating, accounting, and project management.<\/p>  <p class=\"wp-block-paragraph\">Howard Stearn, controller for E.R. Lewis, explains that, \u201cThe [virtual] binder in the software has been incredibly helpful. We used to have a big stack of job folders with unpaid invoices, sales tax reports, contracts, that sort of thing. Now, everything is in ProContractorMX. All of our communications for the project are in one place.\u201d<\/p>  <p class=\"wp-block-paragraph\">Accessibility from the field is possible because of the software, which provides access to important project data using an iPad. \u201cMy absolute favorite function with ProContractorMX is the ability to import timecards automatically,\u201d says Stearn. \u201cThere is no manual re-entry of handwritten data. We\u2019ve also been able to put all of our plans into it, so instead of having people running around with great big rolls of plans or not having the most up-to-date revisions of plans in their truck, all they have to do is pull out their iPad and they have the most up-to-date information.\u201d<\/p>  <p class=\"wp-block-paragraph\">When it comes to collaboration, Stearn says, \u201cProContractorMX is really the first software that ties together field and office operations and forces them to communicate seamlessly.\u201d<\/p>  <p class=\"wp-block-paragraph\"><em>Dan Lehman, is vice president at Maxwell Systems, King of Prussia, Pa.<\/em><\/p> <\/div> <\/div><\/div><p class=\"wp-block-paragraph\">\u201cThe idea of collaboration software had been bandied about for years knowing that construction is not a do-it-yourself proposition,\u201d says Wayne Newitts, marketing director, Dexter + Chaney, Seattle. \u201cIt\u2019s hard enough to control one company\u2019s workers let alone coordinate the work force for many separate companies. We realized that our business management software, our ERP software, wasn\u2019t enough to manage the complexity of a project. We ended up deciding that what would allow a contractor to do that was document management. From project conception to the final punchlist there is a trail of documents attached. The documents may be owned or managed by a single entity but they have to be shared and modified by many different entities. Documents are something that can be managed and are tied to the workflow.\u201d Venture allows the general contractor or project manager to stay on top of the project workflow including invitations to bid, subcontractor pre-qualification, submittals, RFIs, and change orders. It also maintains a complete list of contacts for a project and knows who has permission to review or make changes.<\/p><p class=\"wp-block-paragraph\">\u201cThere\u2019s also an electronic plan room for managing bids which feeds over to the actual construction process. We had complaints from subs that after bid day, they get the job and the work started all over.\u201d That is, that none of the calculations generated to make a bid transferred into the project management software. \u201cWe added applications to convert the bids to live construction.\u201d<\/p><p class=\"wp-block-paragraph\">Other features include:<\/p><ul class=\"wp-block-list\"> <li>Information on vendors so the contractor knows who is prequalified and who to invite to bid.<\/li> <li>A smart document filing feature where the software will suggest the proper folder to put them in and will learn as it goes along.<\/li> <li>A version control function and an audit trail so everyone can see who made changes and when.<\/li> <li>Ability to be customized without the need for a lot of IT support.<\/li> <li>Tracking the submittal process to controls who\u2019s responsible with its \u201cball-in-court\u201d function.<\/li><\/ul><p class=\"wp-block-paragraph\">Venture is owned by the GC and is free to the subcontractors and vendors working on a project.<\/p><h3 class=\"wp-block-heading\">Direct connection<\/h3><p class=\"wp-block-paragraph\">There are a few things that true project collaboration software must be able to accomplish. \u201cIt\u2019s a direct connection for the entire construction team to project information, design status, who can and has made changes, and the status of all equipment,\u201d says Huw Roberts, vice president of marketing, Bentley Systems, Exton, Pa. Bentley\u2019s ProjectWise collaboration software, \u201callows everyone to get the information they need and to keep private what they want to keep private. It manages all permissions and access, and makes sure everyone is using the right versions of drawings. It also provides dynamic feedback, so that any mark-ups are linked to the right source and document and person.\u201d The software includes a dashboard indicating what actions need to be taken and who needs to approve what.<\/p><p class=\"wp-block-paragraph\">At the beginning of a project, the project manager would define the roles for everyone on the project team, assigning rights and responsibilities to an individual or a company. As the project status changes, this triggers changes in the roles and responsibilities. \u201cIt\u2019s as simple as, telling the software that when a certain document changes, notify me and make me in charge,\u201d says Roberts.<\/p><p class=\"wp-block-paragraph\">When ProjectWise sends notification to a project team member, it knows who has opened a document and when. The notification, via e-mail or just in ProjectWise itself, includes a link that takes the person to the document in question. All this allows the contractor (or subcontractor) to easily collaborate with the designers and also with the detailers.<\/p><p class=\"wp-block-paragraph\">Collaboration software isn\u2019t needed for all projects but on large complex jobs it can create great efficiencies.<\/p><hr><h3 class=\"wp-block-heading\">Web-Based Collaboration<\/h3><p class=\"wp-block-paragraph\">With multiple buildings, permits, and subcontractors, the construction of the Washington Hospital Composite Central Plant &#038; Center for Joint Replacement in Fremont, Calif., needed a way to keep the complex construction on track. When Swinerton Builders was selected to build the $115-million expansion, its goals were to successfully manage the complex project and to continue to be the premier green building contractor in the west. With cost savings, ease of use, and collaboration in mind, Swinerton chose EADOC\u2019s collaborative construction project management software.<\/p><div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\"> <\/div><p class=\"wp-block-paragraph\">\u201cThe primary driver going into this [project] was knowing that it was going to be complex with five different buildings and five different permits,\u201d says Eric Davis, manager of virtual design &#038; construction, Swinerton Builders, San Francisco. \u201cWe needed a system that would allow us to collaborate with all parties so information could be entered once, and the appropriate users could view it.\u201d<\/p><p class=\"wp-block-paragraph\">With many geographically distributed users (including more than 60 subcontractors), the project team could effortlessly exchange project documents. The ability to customize the system was key. \u201cWe looked at needs and made suggestions to EADOC,\u201d says Davis. \u201cThey quickly accommodated us with adaptations to the system to help our workflow.\u201d The team was happily surprised with the ease of customizing the system.<\/p><p class=\"wp-block-paragraph\">The biggest advantage to William P. Young Construction, the concrete contractor on the Washington Hospital project, was that inspection requests were submitted quickly and efficiently, allowing Swinerton\u2019s quality control superintendent to review and forward information to the appropriate inspecting parties. Since the system issues email alerts, Swinerton Builders was always notified immediately of an inspection request and would initiate its own quality checks prior to forwarding the inspection request to the state inspectors. Robert Axton, Swinerton senior superintendent, says \u201cIf the inspector wants to know the location of every anchor bolt below the floor, I can get everything from the EADOC software.\u201d<\/p><p class=\"wp-block-paragraph\">In addition to the inspection process, turnaround time for other workflows such as RFIs, submittals, pay applications, and transmittals was also reduced. \u201cWe could link RFIs easily, which was extremely valuable,\u201d says Axton. \u201cIt was basically our workhorse, managing daily correspondence between submittals, RFIs, transmittals, and inspection requests.\u201d<\/p><p class=\"wp-block-paragraph\">By integrating EADOC\u2019s collaborative construction management software, Swinerton achieved its goal of managing this multi-million dollar project in the most effective manner, realizing time and cost savings of more than $400,000. Staying true to its commitment to green building, Swinerton estimates that the paperless system saved 1.3 million sheets of paper, or about 198 trees. Eric Law is the founder of EADOC, Oakland, Calif.<\/p> ","protected":false},"excerpt":{"rendered":"<p>Collaboration may be one of those buzz words\u2014like paradigm or synergy\u2014that, for the sake of clear communication\u2014should be avoided. But a new kind of software that has emerged under the general description of project collaboration has features that make it worth knowing about. Think of collaborative construction management software as enhanced project management software that [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":69781,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"scheduledNewsletterDates":[],"_scheduled_newsletter_id":0,"footnotes":"","jetpack_post_was_ever_published":false,"zonda_content_type_url_append":"_o","zonda_dfp_zone":"","zonda_exclude_recommended_contents":false,"zonda_exclude_most_popular":false,"zonda_exclude_tagged_results":false,"zonda_eyebrow":"","zonda_last_newsletter_date":"2099-12-31T23:59:59.999-05:00","zonda_original_url":"","zonda_pdf_version":0,"zonda_print_headline":"Working Together","zonda_promo_abstract":"Project collaboration software allows control of multiple subcontractors and vendors from a single location.","zonda_promo_headline":"","zonda_promo_image":0,"zonda_subheadline":"Technology keeps the team on the same page."},"tags":[],"news_item_type":[1887],"section_10":[83543],"subject":[872,197,195],"organization":[5214,52416,56909],"award":[],"person":[89515,89512,89513,89514,64051,89511],"product_type_10":[],"content-group":[],"event":[],"location":[],"state":[],"brand":[],"jlc-category":[],"year_tax":[],"sponsor":[],"coauthors":[],"class_list":["post-69785","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","news_item_type-report-research","section_10-technology","subject-concrete-construction","subject-software","subject-technology","organization-bentley","organization-gehry-technologies","organization-newforma","person-dan-lehman","person-eric-davis","person-eric-law","person-howard-stearn","person-huw-roberts","person-wayne-newitts"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.0 (Yoast SEO v28.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Construction Project Collaboration Software<\/title>\n<meta name=\"description\" content=\"Technology keeps the team on the same page.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Project Collaboration Software\" \/>\n<meta property=\"og:description\" content=\"Technology keeps the team on the same page.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o\/\" \/>\n<meta property=\"og:site_name\" content=\"Concrete Construction Magazine\" \/>\n<meta property=\"article:published_time\" content=\"2012-10-11T14:46:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1333\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/technology\\\/construction-project-collaboration-software_o#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/technology\\\/construction-project-collaboration-software_o\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Construction Project Collaboration Software\",\"datePublished\":\"2012-10-11T14:46:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/technology\\\/construction-project-collaboration-software_o\\\/\"},\"wordCount\":1603,\"image\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/technology\\\/construction-project-collaboration-software_o#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2025\\\/06\\\/tmp4f65-2etmp-tcm45-1585242.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/technology\\\/construction-project-collaboration-software_o\\\/\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/technology\\\/construction-project-collaboration-software_o\",\"name\":\"Construction Project Collaboration Software\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/technology\\\/construction-project-collaboration-software_o#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/technology\\\/construction-project-collaboration-software_o#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2025\\\/06\\\/tmp4f65-2etmp-tcm45-1585242.jpg\",\"datePublished\":\"2012-10-11T14:46:01+00:00\",\"author\":{\"@id\":\"\"},\"description\":\"Technology keeps the team on the same page.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/technology\\\/construction-project-collaboration-software_o#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/technology\\\/construction-project-collaboration-software_o\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/technology\\\/construction-project-collaboration-software_o#primaryimage\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2025\\\/06\\\/tmp4f65-2etmp-tcm45-1585242.jpg\",\"contentUrl\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2025\\\/06\\\/tmp4f65-2etmp-tcm45-1585242.jpg\",\"width\":2000,\"height\":1333,\"caption\":\"This large complex project was maanged more efficiently with collaboration software.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/technology\\\/construction-project-collaboration-software_o#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Project Collaboration Software\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/#website\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/\",\"name\":\"Concrete Construction Magazine\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Construction Project Collaboration Software","description":"Technology keeps the team on the same page.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o","og_locale":"en_US","og_type":"article","og_title":"Construction Project Collaboration Software","og_description":"Technology keeps the team on the same page.","og_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o\/","og_site_name":"Concrete Construction Magazine","article_published_time":"2012-10-11T14:46:01+00:00","og_image":[{"width":2000,"height":1333,"url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o#article","isPartOf":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o\/"},"author":{"name":"","@id":""},"headline":"Construction Project Collaboration Software","datePublished":"2012-10-11T14:46:01+00:00","mainEntityOfPage":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o\/"},"wordCount":1603,"image":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o#primaryimage"},"thumbnailUrl":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o\/","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o","name":"Construction Project Collaboration Software","isPartOf":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o#primaryimage"},"image":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o#primaryimage"},"thumbnailUrl":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg","datePublished":"2012-10-11T14:46:01+00:00","author":{"@id":""},"description":"Technology keeps the team on the same page.","breadcrumb":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o#primaryimage","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg","contentUrl":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg","width":2000,"height":1333,"caption":"This large complex project was maanged more efficiently with collaboration software."},{"@type":"BreadcrumbList","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/technology\/construction-project-collaboration-software_o#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/"},{"@type":"ListItem","position":2,"name":"Construction Project Collaboration Software"}]},{"@type":"WebSite","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/#website","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/","name":"Concrete Construction Magazine","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"jetpack_sharing_enabled":true,"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Concrete Construction Magazine","distributor_original_site_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction","push-errors":false,"jetpack_featured_media_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp4f65-2etmp-tcm45-1585242.jpg","_links":{"self":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts\/69785","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/comments?post=69785"}],"version-history":[{"count":0,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts\/69785\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/media\/69781"}],"wp:attachment":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/media?parent=69785"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/tags?post=69785"},{"taxonomy":"news_item_type","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/news_item_type?post=69785"},{"taxonomy":"section_10","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/section_10?post=69785"},{"taxonomy":"subject","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/subject?post=69785"},{"taxonomy":"organization","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/organization?post=69785"},{"taxonomy":"award","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/award?post=69785"},{"taxonomy":"person","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/person?post=69785"},{"taxonomy":"product_type_10","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/product_type_10?post=69785"},{"taxonomy":"content-group","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/content-group?post=69785"},{"taxonomy":"event","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/event?post=69785"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/location?post=69785"},{"taxonomy":"state","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/state?post=69785"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/brand?post=69785"},{"taxonomy":"jlc-category","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/jlc-category?post=69785"},{"taxonomy":"year_tax","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/year_tax?post=69785"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/sponsor?post=69785"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/coauthors?post=69785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}