{"id":67454,"date":"2009-11-11T18:08:29","date_gmt":"2009-11-11T18:08:29","guid":{"rendered":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/article\/beyond-constructability_o"},"modified":"2009-11-11T18:08:29","modified_gmt":"2009-11-11T18:08:29","slug":"beyond-constructability_o","status":"publish","type":"post","link":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o\/","title":{"rendered":"Beyond constructability"},"content":{"rendered":"\n\n<div class=\"image-carousel\"\n\trole=\"region\"\n\taria-roledescription=\"carousel\"\n\taria-label=\"Image carousel\"\n\tdata-total-slides=\"5\"\n\t>\n\n\t<div class=\"image-carousel-top\">\n\t\t\n\t\t<div class=\"carousel-counter\">\n\t\t\t<span class=\"current-index\">1<\/span>\n\t\t\tof\t\t\t<span class=\"total-count\">5<\/span>\n\t\t<\/div>\n\t<\/div>\n\n\t<div class=\"image-carousel__hero-wrapper\">\n\t\t<button class=\"carousel-prev\"\n\t\t\t\taria-label=\"Previous slide\"\n\t\t\t\ttype=\"button\">\n\t\t\t<span class=\"icon\" aria-hidden=\"true\"><\/span>\n\t\t<\/button>\n\n\t\t<div class=\"carousel-main\" aria-live=\"polite\">\n\t\t\t\t\t\t\t<div class=\"carousel-slide active\"\n\t\t\t\t\tid=\"carousel-slide-0\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 1 of 5\"\n\t\t\t\t\taria-hidden=\"false\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Load the first image immediately at full size -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp905-2etmp-tcm111-1341912.jpg?w=250\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp905-2etmp-tcm111-1341912.jpg 250w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp905-2etmp-tcm111-1341912.jpg?resize=193,114 193w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp905-2etmp-tcm111-1341912.jpg?resize=221,131 221w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 250px) 100vw, 250px\"\n\t\t\t\t\t\t\talt=\"The capability of adding equipment data, and integrating that data with GIS information, turns BIM into a powerful tool.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"The capability of adding equipment data, and integrating that data with GIS information, turns BIM into a powerful tool.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Current Builders\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"carousel-slide hidden\"\n\t\t\t\t\tid=\"carousel-slide-1\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 2 of 5\"\n\t\t\t\t\taria-hidden=\"true\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Lazy load other main images with data-src to be loaded only when needed -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp906-2etmp-tcm111-1341915.jpg?w=250\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp906-2etmp-tcm111-1341915.jpg 250w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp906-2etmp-tcm111-1341915.jpg?resize=179,114 179w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp906-2etmp-tcm111-1341915.jpg?resize=206,131 206w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 250px) 100vw, 250px\"\n\t\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\t\tclass=\"lazy-load-image\"\n\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"carousel-slide hidden\"\n\t\t\t\t\tid=\"carousel-slide-2\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 3 of 5\"\n\t\t\t\t\taria-hidden=\"true\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Lazy load other main images with data-src to be loaded only when needed -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp907-2etmp-tcm111-1341918.jpg?w=250\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp907-2etmp-tcm111-1341918.jpg 250w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp907-2etmp-tcm111-1341918.jpg?resize=202,114 202w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp907-2etmp-tcm111-1341918.jpg?resize=232,131 232w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 250px) 100vw, 250px\"\n\t\t\t\t\t\t\talt=\"The network of tunnels, pipes, and other underground utilities serving the 47 institutions of the Texas Medical Center in Houston complicates foundation work. By combining the proposed BIM of the Texas Children&#039;s Hospital Maternity Center with GIS data on subterranean structures, engineers pinpointed potential interferences. Portions of the foundation were redesigned to avoid conflicts before construction, rather than waiting to address them as a field problem.\"\n\t\t\t\t\t\t\tclass=\"lazy-load-image\"\n\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"The network of tunnels, pipes, and other underground utilities serving the 47 institutions of the Texas Medical Center in Houston complicates foundation work. By combining the proposed BIM of the Texas Children&#039;s Hospital Maternity Center with GIS data on subterranean structures, engineers pinpointed potential interferences. Portions of the foundation were redesigned to avoid conflicts before construction, rather than waiting to address them as a field problem.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Jim Jacobi\/Walter P. Moore\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"carousel-slide hidden\"\n\t\t\t\t\tid=\"carousel-slide-3\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 4 of 5\"\n\t\t\t\t\taria-hidden=\"true\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Lazy load other main images with data-src to be loaded only when needed -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp908-2etmp-tcm111-1341922.jpg?w=200\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp908-2etmp-tcm111-1341922.jpg 200w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp908-2etmp-tcm111-1341922.jpg?resize=185,114 185w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 200px) 100vw, 200px\"\n\t\t\t\t\t\t\talt=\"Models can include information \u2014 for example, about the fa\u00e7ade, the finishes for each interior wall and floor surface, and specific plumbing fixtures \u2014 that goes far beyond basic dimensions and locations of building elements.\"\n\t\t\t\t\t\t\tclass=\"lazy-load-image\"\n\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"Models can include information \u2014 for example, about the fa\u00e7ade, the finishes for each interior wall and floor surface, and specific plumbing fixtures \u2014 that goes far beyond basic dimensions and locations of building elements.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Current Builders\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"carousel-slide hidden\"\n\t\t\t\t\tid=\"carousel-slide-4\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 5 of 5\"\n\t\t\t\t\taria-hidden=\"true\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Lazy load other main images with data-src to be loaded only when needed -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp909-2etmp-tcm111-1341926.jpg?w=200\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp909-2etmp-tcm111-1341926.jpg 200w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp909-2etmp-tcm111-1341926.jpg?resize=170,114 170w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp909-2etmp-tcm111-1341926.jpg?resize=196,131 196w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp909-2etmp-tcm111-1341926.jpg?resize=160,107 160w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 200px) 100vw, 200px\"\n\t\t\t\t\t\t\talt=\"Tekla Structures includes object data that simplifies incorporating detailed concrete and rebar design in BIM models.\"\n\t\t\t\t\t\t\tclass=\"lazy-load-image\"\n\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"Tekla Structures includes object data that simplifies incorporating detailed concrete and rebar design in BIM models.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Tekla\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\t<button class=\"carousel-next\"\n\t\t\t\taria-label=\"Next slide\"\n\t\t\t\ttype=\"button\">\n\t\t\t<span class=\"icon\" aria-hidden=\"true\"><\/span>\n\t\t<\/button>\n\t<\/div>\n\n\t<div class=\"carousel-captions-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption active\"\n\t\t\t\t\tid=\"carousel-caption-0\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Current Builders<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"The capability of adding equipment data, and integrating that data with GIS information, turns BIM into a powerful tool.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tThe capability of adding equipment data, and integrating that da&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-0\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-0\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tThe capability of adding equipment data, and integrating that data with GIS information, turns BIM into a powerful tool.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption hidden\"\n\t\t\t\t\tid=\"carousel-caption-2\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Jim Jacobi\/Walter P. Moore<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"The network of tunnels, pipes, and other underground utilities serving the 47 institutions of the Texas Medical Center in Houston complicates foundation work. By combining the proposed BIM of the Texas Children&#039;s Hospital Maternity Center with GIS data on subterranean structures, engineers pinpointed potential interferences. Portions of the foundation were redesigned to avoid conflicts before construction, rather than waiting to address them as a field problem.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tThe network of tunnels, pipes, and other underground utilities s&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-2\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-2\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tThe network of tunnels, pipes, and other underground utilities serving the 47 institutions of the Texas Medical Center in Houston complicates foundation work. By combining the proposed BIM of the Texas Children&#039;s Hospital Maternity Center with GIS data on subterranean structures, engineers pinpointed potential interferences. Portions of the foundation were redesigned to avoid conflicts before construction, rather than waiting to address them as a field problem.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption hidden\"\n\t\t\t\t\tid=\"carousel-caption-3\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Current Builders<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"Models can include information \u2014 for example, about the fa\u00e7ade, the finishes for each interior wall and floor surface, and specific plumbing fixtures \u2014 that goes far beyond basic dimensions and locations of building elements.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tModels can include information \u2014 for example, about the fa\u00e7ad&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-3\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-3\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tModels can include information \u2014 for example, about the fa\u00e7ade, the finishes for each interior wall and floor surface, and specific plumbing fixtures \u2014 that goes far beyond basic dimensions and locations of building elements.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption hidden\"\n\t\t\t\t\tid=\"carousel-caption-4\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Tekla<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"Tekla Structures includes object data that simplifies incorporating detailed concrete and rebar design in BIM models.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tTekla Structures includes object data that simplifies incorporat&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-4\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-4\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tTekla Structures includes object data that simplifies incorporating detailed concrete and rebar design in BIM models.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\n\t<div class=\"carousel-thumbnails-wrapper\" role=\"tablist\" aria-label=\"Thumbnail navigation\">\n\t\t<div class=\"carousel-thumbnails\">\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper active\"\n\t\t\t\t\t\tdata-index=\"0\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 1\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-1\"\n\t\t\t\t\t\taria-selected=\"true\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp905-2etmp-tcm111-1341912.jpg?w=150&#038;h=148&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper \"\n\t\t\t\t\t\tdata-index=\"1\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 2\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-2\"\n\t\t\t\t\t\taria-selected=\"false\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp906-2etmp-tcm111-1341915.jpg?w=150&#038;h=150&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper \"\n\t\t\t\t\t\tdata-index=\"2\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 3\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-3\"\n\t\t\t\t\t\taria-selected=\"false\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp907-2etmp-tcm111-1341918.jpg?w=150&#038;h=141&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper \"\n\t\t\t\t\t\tdata-index=\"3\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 4\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-4\"\n\t\t\t\t\t\taria-selected=\"false\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp908-2etmp-tcm111-1341922.jpg?w=150&#038;h=123&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper \"\n\t\t\t\t\t\tdata-index=\"4\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 5\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-5\"\n\t\t\t\t\t\taria-selected=\"false\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/tmp909-2etmp-tcm111-1341926.jpg?w=150&#038;h=134&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t<\/div>\n\t<\/div>\n\n\t<\/div>\n\r<div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">\r <p class=\"wp-block-paragraph\">Imagine how much your operations and maintenance efficiency would improve if you had an owner&#8217;s manual for each facility.<\/p>\r <p class=\"wp-block-paragraph\">That&#8217;s just what you&#8217;d get with building information modeling (BIM), which refers to both the computer modeling process and the resulting model itself. The newest versions of the software give designers, owners, and contractors a digital picture of all aspects \u2014 equipment as well as architectural and structural elements \u2014 of a building and make collaboration between the three much easier than earlier iterations.<\/p>\r <p class=\"wp-block-paragraph\">The tool can be used at any stage of a facility&#8217;s life, but provides the greatest long-term usefulness when deployed by designers at the project conception stage, and then by contractors through the construction phase. When the designer develops a model and passes it on to contractors, the contractors can do takeoffs, scheduling, and other construction planning with up-to-date information that&#8217;s a virtual representation of the construction. The model can then be turned over to the owner as a highly detailed and accurate \u201cas-built,\u201d providing a reliable basis for decision-making throughout the facility&#8217;s life.<\/p>\r <p class=\"wp-block-paragraph\">The ability to add data is what makes BIM so powerful: It allows any individual user to do as much, or as little, with the tool as desired.<\/p>\r <p class=\"wp-block-paragraph\">One example is the U.S. General Services Administration (GSA), which owns and leases more than 354 million square feet of space in 8,600 buildings in more than 2,200 communities nationwide. GSA has been taking advantage of the tool since 2003. <i>GSA Building Information Modeling Guide Series 05 \u2014 Energy Performance<\/i> describes how the organization is using emerging BIM-based energy modeling technologies to improve energy and thermal comfort performance in its current and future building stock.<\/p>\r <p class=\"wp-block-paragraph\">\u201cEnergy modeling using BIM has the potential to simplify the process \u2026 by leveraging building information that exists in the architectural or mechanical models created by the project design team,\u201d the guide says.<\/p>\r <p class=\"wp-block-paragraph\"><b>CUSTOM CONCEPTUALIZATION<\/b><\/p>\r <p class=\"wp-block-paragraph\">As a visualization tool, BIM helps everyone involved in a project to understand complicated space arrangements, such as in congested mechanical rooms. Unlike earlier visualization methods, however, it can include a wealth of information about each individual element. For instance, in addition to its dimensions and location, information about a pipe may also include its material, function, condition, and other parametric data.<\/p>\r <p class=\"wp-block-paragraph\">Another useful feature, particularly for construction, is clash detection. Users can run a check at any time to identify interferences between different building elements. To avoid running exhaustive checks of every item each time the clash detection is invoked, the program can be set to check for interferences only between certain portions of the model; for example, mechanical piping and electrical conduits. Wise use of the clash detection feature can eliminate many, if not most, field interference problems before they have a chance to affect the construction schedule.<\/p>\r <p class=\"wp-block-paragraph\">To make clash detection even more useful, attributes like access requirements can be modeled into a building element. \u201cYou can allow for the unseen,\u201d says Robert Middlebrooks, AIA, industry programs manager for Autodesk Inc., provider of 2D and 3D design software. \u201cFor example, every valve that a worker needs to open or close needs some clearance around it, and you can build that into the model.\u201d<\/p>\r <p class=\"wp-block-paragraph\">Other examples include allowing space for a door to swing open where filters periodically must be changed, and ensuring that there is enough space near a ladder \u2014 perhaps a 3-foot clearance all around \u2014 so a person can climb it. With these attributes built into the model, users can run \u201csoft\u201d clash detections that report when a clearance has been compromised. This allows design adjustments to be made before construction or installation, eliminating long-term operational irritations.<\/p>\r <p class=\"wp-block-paragraph\">Such requirements also can be applied to entire categories of elements.<\/p>\r <p class=\"wp-block-paragraph\">\u201cYou may want to have 4 inches of clearance around every pipe to permit inspection and painting,\u201d Middlebrooks says. \u201cEach pipe already has attributes \u2014 size, material, thickness, function \u2014 and you just model the clearance requirement as additional data tied to an attribute.\u201d Having gone beyond constructability issues, the program helps create a facility that is maintainable and easy to operate.<\/p>\r <p class=\"wp-block-paragraph\"><b>TURNING DATA INTO PICTURES<\/b><\/p>\r <p class=\"wp-block-paragraph\">BIM uses a structure reminiscent of a relational database, and the core model often consists of a number of individual models aggregated together. Depending on the particular project, either the architect or design engineer may put together the core model. Others, such as the mechanical and electrical contractors, put together their own models that are then tied into the core model, not unlike layers on a CAD drawing. Embedded in each of the models is any information the user chooses to include.<\/p>\r <p class=\"wp-block-paragraph\">Some software is bidirectional and reflects changes made on any of the secondary models throughout the entire model. Other programs are unidirectional, accepting changes made on the secondary models only as imported data to the main model.<\/p>\r <p class=\"wp-block-paragraph\">Individual programs use a variety of file formats, but most support more than their native file formats. Tekla Structures, for example, supports IFC, DGN, DWG, XML, and other nonproprietary formats for model and data aggregation activities. Some programs have built-in translation capabilities; for example, Autodesk and Bentley Systems Inc. have an interoperability agreement that enables each program to read and write the other&#8217;s native formats.<\/p>\r <p class=\"wp-block-paragraph\">In general, however, BIM technology is still at the point where having a good utility program to manage the translation and meld data is worthwhile.<\/p>\r <p class=\"wp-block-paragraph\">One such program is Autodesk&#8217;s Navis-Works, a nonproprietary aggregator that combines data from virtually any BIM-related program. Its modules allow you to work with the model as well as view it. Whereas the actual BIM programs are the tools for design activities, this aggregator is a good tool for the construction and execution of a project.<\/p>\r <p class=\"wp-block-paragraph\">Phoenix-based general contractor Sundt Construction uses NavisWorks for viewing and investigating models as well as for visualizing how concrete elements fit with other building systems. (See Web extra on page 33.)<\/p>\r <p class=\"wp-block-paragraph\">For example, a recent project called for two 6-foot-square spread footings just 2 feet apart. Ordinarily, says Sundt&#8217;s Simulated Construction Manager Dan Russell, the crew would form a single 6&#215;14-foot placement. But a quick look at the building model showed floor drains and piping in the 2-foot space, so he told the crew not to combine the two footings.<\/p>\r <p class=\"wp-block-paragraph\">Another viewing tool is Adobe Acrobat&#8217;s 9 Pro Extended version, which converts a BIM model in IFC format to a PDF with full visualization capabilities and access to the object property data associated with the model.<\/p>\r<\/div> \r<p class=\"wp-block-paragraph\">\r \r<\/p>\r\r\r <p class=\"wp-block-paragraph\">Though the basic BIM concept is common to all software, there are variations because of a program&#8217;s origins:<\/p>\r <li>Graphisoft&#8217;s ArchiCAD developed from an architectural CAD package and so addresses the design process from that perspective.<\/li>\r <li>Bentley&#8217;s Architecture also begins with an architectural approach.<\/li>\r <li>Autodesk&#8217;s Revit was developed for architectural design and subsequent building construction and management.<\/li>\r <li>Tekla Structures is based on the company&#8217;s structural design roots and so has an approach that starts with material properties and analysis.<\/li>\r <li>Vico Software Inc.&#8217;s 5D Virtual Construction Suite incorporates modeling, estimating, and scheduling into one product, making it 5D by adding a financial dimension to the model. Vico and Computer Methods international Corp. (CMiC), which specializes in project management software, recently partnered to integrate their BIM and enterprise resource planning products. The goal: Get BIM into the hands of builders and executives instead of having it confined to the design and preconstruction phases of a project.<\/li>\r <p class=\"wp-block-paragraph\">Because BIM has the potential to affect such a broad range of design and construction activities, many special-interest groups have formed to share thoughts, concerns, and best practices.<\/p>\r <p class=\"wp-block-paragraph\">The American Institute of Architects and Associated General Contractors of America (AGC) both have focus groups, and AGC is updating its <i>Contractors&#8217; Guide to BIM<\/i>. Numerous industry associations have task groups exploring specific uses of the tool.<\/p><p class=\"wp-block-paragraph\"><b>IMPLICATIONS FOR INFRASTRUCTURE<\/b>\r <\/p>\r <p class=\"wp-block-paragraph\">On the commercial side, interest in BIM has exploded in recent years. Virtually every structural request for proposal (RFP) that consulting engineering firm Walter P. Moore, Houston, sees includes requirements for BIM delivery.<\/p>\r <p class=\"wp-block-paragraph\">\u201cOnce clients become exposed to what it can do for a project, they begin to ask for it,\u201d says Chief Information Officer James Jacobi, PE.<\/p>\r <p class=\"wp-block-paragraph\">Jacobi says that by identifying and removing problems early, the information-packed digital assets that result from using BIM on projects are transforming the way supply chain partners work together to improve the design and construction process. Add to that the fact that the tool can provide the groundwork for an ongoing facility management plan.<\/p>\r <p class=\"wp-block-paragraph\">It&#8217;s important to establish BIM-based objectives for a project before requesting proposals, Jacobi says. Part of that will depend on the competency of your team, including members&#8217; experience and levels of expertise, to work with the tool. Then include specific questions \u2014 perhaps as simple as \u201cDescribe your BIM experience\u201d \u2014 to help determine which potential partners are up to the task.<\/p>\r <p class=\"wp-block-paragraph\"><i>\u2014 Klemens <a href=\"mailto:(klemenst@comcast.net\" target=\"_blank\">(klemenst@comcast.net)<\/a> is senior editor of<\/i> Modern Steel Construction<i>, the official publication of the American Institute of Steel Construction, and former technical editor of CONCRETE CONSTRUCTION, a sister magazine to PUBLIC WORKS.<\/i><\/p>\r <p class=\"wp-block-paragraph\"><b><a href=\"http:\/\/www.pwmag.com\/industry-news.asp?sectionID=0&#038;articleID=544921\" target=\"_blank\">Web Extra<\/a><\/b><\/p>\r <p class=\"wp-block-paragraph\">For more information, including an article on how contractors are e using BIM, visit the \u201carticle links\u201d page underr \u201cresources\u201d at <b>www.pwmag.com<\/b>.<\/p>\r \r","protected":false},"excerpt":{"rendered":"<p>Imagine how much your operations and maintenance efficiency would improve if you had an owner&#8217;s manual for each facility. That&#8217;s just what you&#8217;d get with building information modeling (BIM), which refers to both the computer modeling process and the resulting model itself. The newest versions of the software give designers, owners, and contractors a digital [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"scheduledNewsletterDates":[],"_scheduled_newsletter_id":0,"footnotes":"","jetpack_post_was_ever_published":false,"zonda_content_type_url_append":"_o","zonda_dfp_zone":"","zonda_exclude_recommended_contents":false,"zonda_exclude_most_popular":false,"zonda_exclude_tagged_results":false,"zonda_eyebrow":"","zonda_last_newsletter_date":"2099-12-31T23:59:59.999-05:00","zonda_original_url":"","zonda_pdf_version":0,"zonda_print_headline":"Beyond constructability","zonda_promo_abstract":"Imagine how much your operations and maintenance efficiency would improve if you had an owner's manual for each facility.","zonda_promo_headline":"","zonda_promo_image":0,"zonda_subheadline":"How building information modeling simplifies building asset management."},"tags":[],"news_item_type":[780],"section_10":[83098],"subject":[15,277,307,76,67,199,40,152,352,353,197],"organization":[2101,3494,1296,1693],"award":[],"person":[],"product_type_10":[],"content-group":[],"event":[],"location":[99],"state":[124,234],"brand":[21460],"jlc-category":[],"year_tax":[],"sponsor":[],"coauthors":[89148],"class_list":["post-67454","post","type-post","status-publish","format-standard","hentry","news_item_type-feature","section_10-management","subject-architects","subject-bim","subject-building-performance","subject-computers","subject-construction-management","subject-construction-software","subject-design","subject-government-projects","subject-performance-metrics","subject-post-occupancy-performance","subject-software","organization-aia","organization-associated-general-contractors","organization-associated-general-contractors-of-america","organization-the-american-institute-of-architects","location-houston-sugar-land-baytown-tx","state-arizona","state-texas","brand-public-works"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.0 (Yoast SEO v28.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Beyond constructability<\/title>\n<meta name=\"description\" content=\"How building information modeling simplifies building asset management.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Beyond constructability\" \/>\n<meta property=\"og:description\" content=\"How building information modeling simplifies building asset management.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o\/\" \/>\n<meta property=\"og:site_name\" content=\"Concrete Construction Magazine\" \/>\n<meta property=\"article:published_time\" content=\"2009-11-11T18:08:29+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n\t<meta name=\"twitter:label2\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data2\" content=\"Thomas L. Klemens, PE\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/management\\\/beyond-constructability_o#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/management\\\/beyond-constructability_o\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Beyond constructability\",\"datePublished\":\"2009-11-11T18:08:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/management\\\/beyond-constructability_o\\\/\"},\"wordCount\":1533,\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/management\\\/beyond-constructability_o\\\/\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/management\\\/beyond-constructability_o\",\"name\":\"Beyond constructability\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/#website\"},\"datePublished\":\"2009-11-11T18:08:29+00:00\",\"author\":{\"@id\":\"\"},\"description\":\"How building information modeling simplifies building asset management.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/management\\\/beyond-constructability_o#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/management\\\/beyond-constructability_o\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/business\\\/management\\\/beyond-constructability_o#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Beyond constructability\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/#website\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/\",\"name\":\"Concrete Construction Magazine\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Beyond constructability","description":"How building information modeling simplifies building asset management.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o","og_locale":"en_US","og_type":"article","og_title":"Beyond constructability","og_description":"How building information modeling simplifies building asset management.","og_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o\/","og_site_name":"Concrete Construction Magazine","article_published_time":"2009-11-11T18:08:29+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes","Written by":"Thomas L. Klemens, PE"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o#article","isPartOf":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o\/"},"author":{"name":"","@id":""},"headline":"Beyond constructability","datePublished":"2009-11-11T18:08:29+00:00","mainEntityOfPage":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o\/"},"wordCount":1533,"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o\/","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o","name":"Beyond constructability","isPartOf":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/#website"},"datePublished":"2009-11-11T18:08:29+00:00","author":{"@id":""},"description":"How building information modeling simplifies building asset management.","breadcrumb":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/business\/management\/beyond-constructability_o#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/"},{"@type":"ListItem","position":2,"name":"Beyond constructability"}]},{"@type":"WebSite","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/#website","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/","name":"Concrete Construction Magazine","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Concrete Construction Magazine","distributor_original_site_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction","push-errors":false,"_links":{"self":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts\/67454","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/comments?post=67454"}],"version-history":[{"count":0,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts\/67454\/revisions"}],"wp:attachment":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/media?parent=67454"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/tags?post=67454"},{"taxonomy":"news_item_type","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/news_item_type?post=67454"},{"taxonomy":"section_10","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/section_10?post=67454"},{"taxonomy":"subject","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/subject?post=67454"},{"taxonomy":"organization","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/organization?post=67454"},{"taxonomy":"award","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/award?post=67454"},{"taxonomy":"person","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/person?post=67454"},{"taxonomy":"product_type_10","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/product_type_10?post=67454"},{"taxonomy":"content-group","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/content-group?post=67454"},{"taxonomy":"event","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/event?post=67454"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/location?post=67454"},{"taxonomy":"state","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/state?post=67454"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/brand?post=67454"},{"taxonomy":"jlc-category","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/jlc-category?post=67454"},{"taxonomy":"year_tax","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/year_tax?post=67454"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/sponsor?post=67454"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/coauthors?post=67454"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}