{"id":64005,"date":"2007-03-12T16:10:35","date_gmt":"2007-03-12T16:10:35","guid":{"rendered":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/article\/easy-formwork-bracing_o"},"modified":"2007-03-12T16:10:35","modified_gmt":"2007-03-12T16:10:35","slug":"easy-formwork-bracing_o","status":"publish","type":"post","link":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o\/","title":{"rendered":"Easy Formwork Bracing"},"content":{"rendered":"<div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\"> <p class=\"wp-block-paragraph\">Many of the most innovative products in the concrete industry were developed by contractors. But product development, and especially testing, can be very expensive. Here&#8217;s a story of a contractor who had a great idea and found a way to get the testing done that didn&#8217;t drain his meager resources.<\/p><p class=\"wp-block-paragraph\">Over the past three years, Steve Bruno has spent \u201call the time and resources I could afford\u201d to develop his Kwicker-Kicker retractable\/extendable form alignment brace. This brace is used to hold formwork in position prior to pouring and to hold the form in place when the concrete weight bears against it. The brace has an outer tube and an inner tube that use turnbuckles and special cotter pins to allow quick, secure, and precise adjustment. Kwicker-Kickers can be attached to formwork in advance at the yard, but remain inside the framing so they aren&#8217;t in the way during stacking and are ready to go when the form is in place. They are, according to Bruno, easy to use and reduce labor costs because forms are braced so quickly. They also eliminate custom cutting of wood braces. <\/p> <p class=\"wp-block-paragraph\">But since a brace failure during construction could lead to potential injuries, Bruno knew that before he started full-scale marketing he would need to have load testing done to prove the brace&#8217;s capacity.<\/p><p class=\"wp-block-paragraph\"> <\/p> <p class=\"wp-block-paragraph\">Engineering firm proposals came back at $38,000 to $40,000, or more. \u201cI realized there&#8217;s gotta be a better\u2014cheaper\u2014way,\u201d says Bruno. So he approached the civil engineering program at California Polytechnic State University, San Luis Obispo, Calif., to see if they would take on his testing as a student project\u2014they said yes. Cal Poly&#8217;s program, known as Sponsor a Lab, although not free, is cheaper considerably than Bruno&#8217;s previous estimates. \u201cThe Sponsor a Lab program is fantastic,\u201d says Bruno. \u201cThe faculty, the facility, and the students are amazing. Being able to help students is a plus and the opportunity to save financially is the icing on the cake.\u201d<\/p> <p class=\"wp-block-paragraph\">The research at Cal Poly was conducted under the oversight of Dr. Charles Chadwell and with the aid of an undergraduate researcher, Levi Gatsos. They set out to determine the safe operating range of the Kwicker-Kicker for bracing cast-in-place concrete walls. Using the allowable values for load, stiffness, and deflection for the brace, safe spacing under given loading conditions was determined. They considered a variety of load conditions to determine an acceptable shoring design for a given application. The Cal Poly team developed extensive bracing tables showing the maximum spacing of the braces for angled loading, for wind load, for combined wind and concrete bearing load, and under horizontal concrete bearing load.<\/p><p class=\"wp-block-paragraph\">Bruno also has conducted extensive field work with the braces. \u201cOver 18 months, the largest pours we used them on were 40 feet long, 2 feet wide, and 16 feet tall, poured at 4 feet an hour,\u201d he says. \u201cIf they are used on a job with large repetitive pours, they will be making you money right away.\u201d His customers seem to agree. \u201cI have been using them for over a year and have realized a definite savings in time and materials in all our bracing and aligning applications,\u201d says Art Aguilar, carpenter foreman with San-Mar Concrete Formwork, Anaheim, Calif. \u201cI recommend Kwicker-Kickers, unless, of course, you are a competing interest!\u201d<\/p> <\/div> ","protected":false},"excerpt":{"rendered":"<p>Many of the most innovative products in the concrete industry were developed by contractors. But product development, and especially testing, can be very expensive. Here&#8217;s a story of a contractor who had a great idea and found a way to get the testing done that didn&#8217;t drain his meager resources. Over the past three years, [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":64006,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"scheduledNewsletterDates":[],"_scheduled_newsletter_id":0,"footnotes":"","jetpack_post_was_ever_published":false,"zonda_content_type_url_append":"_o","zonda_dfp_zone":"","zonda_exclude_recommended_contents":false,"zonda_exclude_most_popular":true,"zonda_exclude_tagged_results":false,"zonda_eyebrow":"Products Solving Problems","zonda_last_newsletter_date":"2099-12-31T23:59:59.999-05:00","zonda_original_url":"","zonda_pdf_version":0,"zonda_print_headline":"Easy Formwork Bracing","zonda_promo_abstract":"The story of a contractor who had a great idea and found a way to get the testing done without draining his meager resources.","zonda_promo_headline":"","zonda_promo_image":0,"zonda_subheadline":""},"tags":[],"news_item_type":[1887],"section_10":[81561],"subject":[51089,246],"organization":[],"award":[],"person":[],"product_type_10":[],"content-group":[],"event":[],"location":[155,645],"state":[126],"brand":[],"jlc-category":[],"year_tax":[],"sponsor":[],"coauthors":[68367],"class_list":["post-64005","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","news_item_type-report-research","section_10-products","subject-cast-in-place-concrete","subject-students","location-los-angeles-long-beach-santa-ana-ca","location-san-luis-obispo-paso-robles-ca","state-california"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.0 (Yoast SEO v28.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Easy Formwork Bracing<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Easy Formwork Bracing\" \/>\n<meta property=\"og:description\" content=\"Many of the most innovative products in the concrete industry were developed by contractors. But product development, and especially testing, can be very expensive. Here&#8217;s a story of a contractor who had a great idea and found a way to get the testing done that didn&#8217;t drain his meager resources. Over the past three years, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o\/\" \/>\n<meta property=\"og:site_name\" content=\"Concrete Construction Magazine\" \/>\n<meta property=\"article:published_time\" content=\"2007-03-12T16:10:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2007\/tmp371-2etmp-tcm45-327224.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"200\" \/>\n\t<meta property=\"og:image:height\" content=\"110\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n\t<meta name=\"twitter:label2\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data2\" content=\"Bill Palmer\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/products\\\/easy-formwork-bracing_o#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/products\\\/easy-formwork-bracing_o\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Easy Formwork Bracing\",\"datePublished\":\"2007-03-12T16:10:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/products\\\/easy-formwork-bracing_o\\\/\"},\"wordCount\":556,\"image\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/products\\\/easy-formwork-bracing_o#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2007\\\/tmp371-2etmp-tcm45-327224.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/products\\\/easy-formwork-bracing_o\\\/\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/products\\\/easy-formwork-bracing_o\",\"name\":\"Easy Formwork Bracing\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/products\\\/easy-formwork-bracing_o#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/products\\\/easy-formwork-bracing_o#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2007\\\/tmp371-2etmp-tcm45-327224.jpg\",\"datePublished\":\"2007-03-12T16:10:35+00:00\",\"author\":{\"@id\":\"\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/products\\\/easy-formwork-bracing_o#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/products\\\/easy-formwork-bracing_o\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/products\\\/easy-formwork-bracing_o#primaryimage\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2007\\\/tmp371-2etmp-tcm45-327224.jpg\",\"contentUrl\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2007\\\/tmp371-2etmp-tcm45-327224.jpg\",\"width\":200,\"height\":110,\"caption\":\"The braces adjust in 1-inch increments, then a fine-tuning turnbuckle allows precise alignment.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/products\\\/easy-formwork-bracing_o#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Easy Formwork Bracing\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/#website\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/\",\"name\":\"Concrete Construction Magazine\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Easy Formwork Bracing","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o","og_locale":"en_US","og_type":"article","og_title":"Easy Formwork Bracing","og_description":"Many of the most innovative products in the concrete industry were developed by contractors. But product development, and especially testing, can be very expensive. Here&#8217;s a story of a contractor who had a great idea and found a way to get the testing done that didn&#8217;t drain his meager resources. Over the past three years, [&hellip;]","og_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o\/","og_site_name":"Concrete Construction Magazine","article_published_time":"2007-03-12T16:10:35+00:00","og_image":[{"width":200,"height":110,"url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2007\/tmp371-2etmp-tcm45-327224.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes","Written by":"Bill Palmer"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o#article","isPartOf":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o\/"},"author":{"name":"","@id":""},"headline":"Easy Formwork Bracing","datePublished":"2007-03-12T16:10:35+00:00","mainEntityOfPage":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o\/"},"wordCount":556,"image":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o#primaryimage"},"thumbnailUrl":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2007\/tmp371-2etmp-tcm45-327224.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o\/","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o","name":"Easy Formwork Bracing","isPartOf":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o#primaryimage"},"image":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o#primaryimage"},"thumbnailUrl":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2007\/tmp371-2etmp-tcm45-327224.jpg","datePublished":"2007-03-12T16:10:35+00:00","author":{"@id":""},"breadcrumb":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o#primaryimage","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2007\/tmp371-2etmp-tcm45-327224.jpg","contentUrl":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2007\/tmp371-2etmp-tcm45-327224.jpg","width":200,"height":110,"caption":"The braces adjust in 1-inch increments, then a fine-tuning turnbuckle allows precise alignment."},{"@type":"BreadcrumbList","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/products\/easy-formwork-bracing_o#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/"},{"@type":"ListItem","position":2,"name":"Easy Formwork Bracing"}]},{"@type":"WebSite","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/#website","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/","name":"Concrete Construction Magazine","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"jetpack_sharing_enabled":true,"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Concrete Construction Magazine","distributor_original_site_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction","push-errors":false,"jetpack_featured_media_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2007\/tmp371-2etmp-tcm45-327224.jpg","_links":{"self":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts\/64005","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/comments?post=64005"}],"version-history":[{"count":0,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts\/64005\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/media\/64006"}],"wp:attachment":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/media?parent=64005"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/tags?post=64005"},{"taxonomy":"news_item_type","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/news_item_type?post=64005"},{"taxonomy":"section_10","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/section_10?post=64005"},{"taxonomy":"subject","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/subject?post=64005"},{"taxonomy":"organization","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/organization?post=64005"},{"taxonomy":"award","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/award?post=64005"},{"taxonomy":"person","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/person?post=64005"},{"taxonomy":"product_type_10","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/product_type_10?post=64005"},{"taxonomy":"content-group","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/content-group?post=64005"},{"taxonomy":"event","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/event?post=64005"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/location?post=64005"},{"taxonomy":"state","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/state?post=64005"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/brand?post=64005"},{"taxonomy":"jlc-category","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/jlc-category?post=64005"},{"taxonomy":"year_tax","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/year_tax?post=64005"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/sponsor?post=64005"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/coauthors?post=64005"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}