{"id":62968,"date":"2006-07-13T15:59:32","date_gmt":"2006-07-13T15:59:32","guid":{"rendered":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/article\/tunnel-vision_o"},"modified":"2006-07-13T15:59:32","modified_gmt":"2006-07-13T15:59:32","slug":"tunnel-vision_o","status":"publish","type":"post","link":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o\/","title":{"rendered":"Tunnel vision"},"content":{"rendered":"\r<div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">\r <p class=\"wp-block-paragraph\">Homeowners don&#8217;t like it when their basements repeatedly flood after heavy rains, and they don&#8217;t want to hear excuses about poor sewer conditions\u2014they just want the problem to go away. The Milwaukee Metropolitan Sewerage District (MMSD) heard these complaints loud and clear, and by 1998, the agency had made the Northwest Side Relief Sewer (NWSRS) project the No. 1 capital improvement project in its 2010 Facilities Plan.<\/p>\r <p class=\"wp-block-paragraph\">At the plan&#8217;s inception, sewer flows from the northwest section of Milwaukee County were collected and transported by shallow sewer interceptors, which discharged to the county&#8217;s Crosstown Tunnel. Rapidly accelerating development and population growth stressed the aging, inadequate infrastructure, causing basement flooding and sewer overflows during wet weather.<\/p>\r <p class=\"wp-block-paragraph\">\u201cWe had two sewers that were like two-lane highways coming together,\u201d said Roger Maurer, MMSD section manager of conveyance. \u201cIt created terrible bottlenecks.\u201d<\/p>\r <p class=\"wp-block-paragraph\">District leaders pinpointed hydraulic bottlenecks in the shallow interceptor system and proposed an intermediate-depth tunnel. The district submitted bids and picked Black &#038; Veatch to steer the project.<\/p>\r <p class=\"wp-block-paragraph\">Despite setbacks and challenges\u2014regulatory changes, concerns about disrupting thousands of paupers&#8217; graves, and potential threats to a rare species of snake\u2014the project worked out well overall. The end result: a 20-foot-diameter tunnel, 7.1 miles long, that has reduced overflows and flooding, and added 88 million gallons of storage to accommodate excess flow. The NWSRS came in on time, under budget, and has been well received by citizens in the seven communities served by the project.<\/p>\r <p class=\"wp-block-paragraph\">One factor Maurer looks for in an AEC firm\u2014one that can make the difference between success and shortcomings\u2014is a knowledgeable, effective, and communicative project manager.<\/p>\r <p class=\"wp-block-paragraph\">\u201cThey should interact often with the project owner,\u201d he said. Thorough documentation also is key. \u201cWhen a project is seven years long, like this one, people will start questioning your decisions, and it&#8217;s important to have the paperwork to back it up.\u201d<\/p>\r <p class=\"wp-block-paragraph\">David Egger, Black &#038; Veatch water global tunneling practice leader, said his team was mindful of the importance of keeping the MMSD up to speed every step of the way.<\/p>\r <p class=\"wp-block-paragraph\">\u201cGood communications were based on lots of person-to-person ideas, sharing lessons learned, and creatively forcing dialogue between parties that don&#8217;t naturally always communicate,\u201d he said.<\/p><p class=\"wp-block-paragraph\"><b>Milwaukee Northwest Side Relief Sewer<\/b>\r <\/p>\r <p class=\"wp-block-paragraph\">Project completion date: November 2005<\/p>\r <p class=\"wp-block-paragraph\">Total cost: $132 million<\/p>\r <p class=\"wp-block-paragraph\">AEC firm: Black &#038; Veatch<\/p>\r <p class=\"wp-block-paragraph\">Location: Milwaukee County<\/p>\r <p class=\"wp-block-paragraph\">Neat stat: A total of 525,000 cubic yards of rubble was excavated from the site; the debris was crushed and used in other area projects, including a park and an airport.<\/p>\r<\/div> \r","protected":false},"excerpt":{"rendered":"<p>Homeowners don&#8217;t like it when their basements repeatedly flood after heavy rains, and they don&#8217;t want to hear excuses about poor sewer conditions\u2014they just want the problem to go away. The Milwaukee Metropolitan Sewerage District (MMSD) heard these complaints loud and clear, and by 1998, the agency had made the Northwest Side Relief Sewer (NWSRS) [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":62971,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"scheduledNewsletterDates":[],"_scheduled_newsletter_id":0,"footnotes":"","jetpack_post_was_ever_published":false,"zonda_content_type_url_append":"_o","zonda_dfp_zone":"","zonda_exclude_recommended_contents":false,"zonda_exclude_most_popular":false,"zonda_exclude_tagged_results":false,"zonda_eyebrow":"","zonda_last_newsletter_date":"2099-12-31T23:59:59.999-05:00","zonda_original_url":"","zonda_pdf_version":0,"zonda_print_headline":"Tunnel vision","zonda_promo_abstract":"Homeowners don't like it when their basements repeatedly flood after heavy rains, and they don't want to hear excuses about poor sewer conditions. The Milwaukee Metropolitan Sewerage District (MMSD) heard these complaints, and by 1998, the agency had made the Northwest Side Relief Sewer (NWSRS) project the No. 1 capital improvement project in its 2010 Facilities Plan.","zonda_promo_headline":"","zonda_promo_image":0,"zonda_subheadline":""},"tags":[84944],"news_item_type":[28],"section_10":[83124],"subject":[596],"organization":[],"award":[],"person":[],"product_type_10":[],"content-group":[],"event":[],"location":[5387],"state":[686],"brand":[21460],"jlc-category":[],"year_tax":[],"sponsor":[],"coauthors":[84868],"class_list":["post-62968","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","tag-top-aec-firms","news_item_type-article","section_10-infrastructure","subject-basement","location-milwaukee-waukesha-west-allis-wi","state-wisconsin","brand-public-works"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.2 (Yoast SEO v28.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tunnel vision<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tunnel vision\" \/>\n<meta property=\"og:description\" content=\"Homeowners don&#8217;t like it when their basements repeatedly flood after heavy rains, and they don&#8217;t want to hear excuses about poor sewer conditions\u2014they just want the problem to go away. The Milwaukee Metropolitan Sewerage District (MMSD) heard these complaints loud and clear, and by 1998, the agency had made the Northwest Side Relief Sewer (NWSRS) [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o\/\" \/>\n<meta property=\"og:site_name\" content=\"Concrete Construction Magazine\" \/>\n<meta property=\"article:published_time\" content=\"2006-07-13T15:59:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2006\/tmpc0d-2etmp-tcm111-1346758.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"250\" \/>\n\t<meta property=\"og:image:height\" content=\"184\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n\t<meta name=\"twitter:label2\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data2\" content=\"Jenni Spinner\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/tunnel-vision_o#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/tunnel-vision_o\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Tunnel vision\",\"datePublished\":\"2006-07-13T15:59:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/tunnel-vision_o\\\/\"},\"wordCount\":418,\"image\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/tunnel-vision_o#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2006\\\/tmpc0d-2etmp-tcm111-1346758.jpg\",\"keywords\":[\"Top AEC Firms\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/tunnel-vision_o\\\/\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/tunnel-vision_o\",\"name\":\"Tunnel vision\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/tunnel-vision_o#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/tunnel-vision_o#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2006\\\/tmpc0d-2etmp-tcm111-1346758.jpg\",\"datePublished\":\"2006-07-13T15:59:32+00:00\",\"author\":{\"@id\":\"\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/tunnel-vision_o#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/tunnel-vision_o\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/tunnel-vision_o#primaryimage\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2006\\\/tmpc0d-2etmp-tcm111-1346758.jpg\",\"contentUrl\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/wp-content\\\/uploads\\\/sites\\\/10\\\/2006\\\/tmpc0d-2etmp-tcm111-1346758.jpg\",\"width\":250,\"height\":184,\"caption\":\"Excavation of the Northwest Side Relief Sewer tunnel in northwestern Milwaukee County took more than a year.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/tunnel-vision_o#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tunnel vision\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/#website\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/\",\"name\":\"Concrete Construction Magazine\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tunnel vision","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o","og_locale":"en_US","og_type":"article","og_title":"Tunnel vision","og_description":"Homeowners don&#8217;t like it when their basements repeatedly flood after heavy rains, and they don&#8217;t want to hear excuses about poor sewer conditions\u2014they just want the problem to go away. The Milwaukee Metropolitan Sewerage District (MMSD) heard these complaints loud and clear, and by 1998, the agency had made the Northwest Side Relief Sewer (NWSRS) [&hellip;]","og_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o\/","og_site_name":"Concrete Construction Magazine","article_published_time":"2006-07-13T15:59:32+00:00","og_image":[{"width":250,"height":184,"url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2006\/tmpc0d-2etmp-tcm111-1346758.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes","Written by":"Jenni Spinner"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o#article","isPartOf":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o\/"},"author":{"name":"","@id":""},"headline":"Tunnel vision","datePublished":"2006-07-13T15:59:32+00:00","mainEntityOfPage":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o\/"},"wordCount":418,"image":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o#primaryimage"},"thumbnailUrl":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2006\/tmpc0d-2etmp-tcm111-1346758.jpg","keywords":["Top AEC Firms"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o\/","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o","name":"Tunnel vision","isPartOf":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o#primaryimage"},"image":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o#primaryimage"},"thumbnailUrl":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2006\/tmpc0d-2etmp-tcm111-1346758.jpg","datePublished":"2006-07-13T15:59:32+00:00","author":{"@id":""},"breadcrumb":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o#primaryimage","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2006\/tmpc0d-2etmp-tcm111-1346758.jpg","contentUrl":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2006\/tmpc0d-2etmp-tcm111-1346758.jpg","width":250,"height":184,"caption":"Excavation of the Northwest Side Relief Sewer tunnel in northwestern Milwaukee County took more than a year."},{"@type":"BreadcrumbList","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/tunnel-vision_o#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/"},{"@type":"ListItem","position":2,"name":"Tunnel vision"}]},{"@type":"WebSite","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/#website","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/","name":"Concrete Construction Magazine","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"jetpack_sharing_enabled":true,"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Concrete Construction Magazine","distributor_original_site_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction","push-errors":false,"jetpack_featured_media_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2006\/tmpc0d-2etmp-tcm111-1346758.jpg","_links":{"self":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts\/62968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/comments?post=62968"}],"version-history":[{"count":0,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts\/62968\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/media\/62971"}],"wp:attachment":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/media?parent=62968"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/tags?post=62968"},{"taxonomy":"news_item_type","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/news_item_type?post=62968"},{"taxonomy":"section_10","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/section_10?post=62968"},{"taxonomy":"subject","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/subject?post=62968"},{"taxonomy":"organization","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/organization?post=62968"},{"taxonomy":"award","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/award?post=62968"},{"taxonomy":"person","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/person?post=62968"},{"taxonomy":"product_type_10","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/product_type_10?post=62968"},{"taxonomy":"content-group","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/content-group?post=62968"},{"taxonomy":"event","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/event?post=62968"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/location?post=62968"},{"taxonomy":"state","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/state?post=62968"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/brand?post=62968"},{"taxonomy":"jlc-category","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/jlc-category?post=62968"},{"taxonomy":"year_tax","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/year_tax?post=62968"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/sponsor?post=62968"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/coauthors?post=62968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}