{"id":58323,"date":"2016-12-21T22:18:32","date_gmt":"2016-12-21T22:18:32","guid":{"rendered":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/article\/make-way-for-wine_o"},"modified":"2016-12-21T22:18:32","modified_gmt":"2016-12-21T22:18:32","slug":"make-way-for-wine_o","status":"publish","type":"post","link":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o\/","title":{"rendered":"Make Way for Wine"},"content":{"rendered":"\n\n<div class=\"image-carousel\"\n\trole=\"region\"\n\taria-roledescription=\"carousel\"\n\taria-label=\"Image carousel\"\n\tdata-total-slides=\"6\"\n\t>\n\n\t<div class=\"image-carousel-top\">\n\t\t\n\t\t<div class=\"carousel-counter\">\n\t\t\t<span class=\"current-index\">1<\/span>\n\t\t\tof\t\t\t<span class=\"total-count\">6<\/span>\n\t\t<\/div>\n\t<\/div>\n\n\t<div class=\"image-carousel__hero-wrapper\">\n\t\t<button class=\"carousel-prev\"\n\t\t\t\taria-label=\"Previous slide\"\n\t\t\t\ttype=\"button\">\n\t\t\t<span class=\"icon\" aria-hidden=\"true\"><\/span>\n\t\t<\/button>\n\n\t\t<div class=\"carousel-main\" aria-live=\"polite\">\n\t\t\t\t\t\t\t<div class=\"carousel-slide active\"\n\t\t\t\t\tid=\"carousel-slide-0\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 1 of 6\"\n\t\t\t\t\taria-hidden=\"false\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Load the first image immediately at full size -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-1586.jpg?w=489\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-1586.jpg 2000w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-1586.jpg?resize=300,225 300w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-1586.jpg?resize=768,576 768w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-1586.jpg?resize=1024,768 1024w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-1586.jpg?resize=1536,1152 1536w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-1586.jpg?resize=489,367 489w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-1586.jpg?resize=236,177 236w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-1586.jpg?resize=152,114 152w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-1586.jpg?resize=175,131 175w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 489px) 100vw, 489px\"\n\t\t\t\t\t\t\talt=\"West Richland (pop. &lt;15,000) Public Works employees, city officials, and Chamber of Commerce celebrate the Oct. 11, 2016, ribbon-cutting of their new wastewater treatment plant. The Washington city took on the $3.2 million project to encourage growth by relieving breweries, creameries, and wineries of the burden of pretreating their effluent. The city received a $2 million low-interest state loan to buy an acre of land and design and build the facility. \"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"West Richland (pop. &lt;15,000) Public Works employees, city officials, and Chamber of Commerce celebrate the Oct. 11, 2016, ribbon-cutting of their new wastewater treatment plant. The Washington city took on the $3.2 million project to encourage growth by relieving breweries, creameries, and wineries of the burden of pretreating their effluent. The city received a $2 million low-interest state loan to buy an acre of land and design and build the facility.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Jamie Lemon, B2 Architects\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"carousel-slide hidden\"\n\t\t\t\t\tid=\"carousel-slide-1\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 2 of 6\"\n\t\t\t\t\taria-hidden=\"true\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Lazy load other main images with data-src to be loaded only when needed -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-westrichland.jpg?w=558\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-westrichland.jpg 2000w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-westrichland.jpg?resize=300,197 300w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-westrichland.jpg?resize=768,505 768w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-westrichland.jpg?resize=1024,674 1024w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-westrichland.jpg?resize=1536,1011 1536w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-westrichland.jpg?resize=558,367 558w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-westrichland.jpg?resize=269,177 269w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-westrichland.jpg?resize=173,114 173w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-westrichland.jpg?resize=199,131 199w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 558px) 100vw, 558px\"\n\t\t\t\t\t\t\talt=\"The consulting team of Wallace Group and J-U-B Engineers chose a 50,000 gpd \u201cpackage\u201d membrane bioreactor (MBR) system manufactured by Cloacina LLC, the largest plant the company\u2019s produced. The Industrial Mempac comprises an influent lift station, screening, influent storage tanks, biological treatment tanks, effluent storage tanks, and solids dewatering and is designed to allow for future expansion. \"\n\t\t\t\t\t\t\tclass=\"lazy-load-image\"\n\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"The consulting team of Wallace Group and J-U-B Engineers chose a 50,000 gpd \u201cpackage\u201d membrane bioreactor (MBR) system manufactured by Cloacina LLC, the largest plant the company\u2019s produced. The Industrial Mempac comprises an influent lift station, screening, influent storage tanks, biological treatment tanks, effluent storage tanks, and solids dewatering and is designed to allow for future expansion.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Cloacina\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"carousel-slide hidden\"\n\t\t\t\t\tid=\"carousel-slide-2\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 3 of 6\"\n\t\t\t\t\taria-hidden=\"true\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Lazy load other main images with data-src to be loaded only when needed -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0339.jpg?w=489\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0339.jpg 2000w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0339.jpg?resize=300,225 300w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0339.jpg?resize=768,576 768w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0339.jpg?resize=1024,768 1024w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0339.jpg?resize=1536,1152 1536w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0339.jpg?resize=489,367 489w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0339.jpg?resize=236,177 236w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0339.jpg?resize=152,114 152w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0339.jpg?resize=175,131 175w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 489px) 100vw, 489px\"\n\t\t\t\t\t\t\talt=\"The Industrial Mempac wastewater treatment system remotely monitors components and displays the information in near real-time. Operators use the touch-screen control panel to tweak the equipment to optimize treatment. Each main component can be touched on the screen and more detailed information and operational features will be displayed. \"\n\t\t\t\t\t\t\tclass=\"lazy-load-image\"\n\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"The Industrial Mempac wastewater treatment system remotely monitors components and displays the information in near real-time. Operators use the touch-screen control panel to tweak the equipment to optimize treatment. Each main component can be touched on the screen and more detailed information and operational features will be displayed.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Drew Woodruff\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"carousel-slide hidden\"\n\t\t\t\t\tid=\"carousel-slide-3\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 4 of 6\"\n\t\t\t\t\taria-hidden=\"true\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Lazy load other main images with data-src to be loaded only when needed -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0342.jpg?w=489\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0342.jpg 2000w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0342.jpg?resize=300,225 300w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0342.jpg?resize=768,576 768w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0342.jpg?resize=1024,768 1024w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0342.jpg?resize=1536,1152 1536w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0342.jpg?resize=489,367 489w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0342.jpg?resize=236,177 236w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0342.jpg?resize=152,114 152w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0342.jpg?resize=175,131 175w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 489px) 100vw, 489px\"\n\t\t\t\t\t\t\talt=\"Local contractor Apollo Inc. worked with the design team and Cloacina to finish construction in August 2016, a month before the completion deadline imposed by the $2 million state loan. Since then, the city\u2019s issued a building permit for a new wine-production facility and given several plant tours to the public and consulting companies. These are the Industrial Mempac wastewater treatment system\u2019s fixed film chamber (fixed film reactor train), aeration chamber (membrane bioreactor train) and solids dewatering. \"\n\t\t\t\t\t\t\tclass=\"lazy-load-image\"\n\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"Local contractor Apollo Inc. worked with the design team and Cloacina to finish construction in August 2016, a month before the completion deadline imposed by the $2 million state loan. Since then, the city\u2019s issued a building permit for a new wine-production facility and given several plant tours to the public and consulting companies. These are the Industrial Mempac wastewater treatment system\u2019s fixed film chamber (fixed film reactor train), aeration chamber (membrane bioreactor train) and solids dewatering.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Drew Woodruff\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"carousel-slide hidden\"\n\t\t\t\t\tid=\"carousel-slide-4\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 5 of 6\"\n\t\t\t\t\taria-hidden=\"true\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Lazy load other main images with data-src to be loaded only when needed -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0348.jpg?w=489\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0348.jpg 2000w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0348.jpg?resize=300,225 300w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0348.jpg?resize=768,576 768w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0348.jpg?resize=1024,768 1024w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0348.jpg?resize=1536,1152 1536w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0348.jpg?resize=489,367 489w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0348.jpg?resize=236,177 236w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0348.jpg?resize=152,114 152w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0348.jpg?resize=175,131 175w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 489px) 100vw, 489px\"\n\t\t\t\t\t\t\talt=\"At left, the Industrial Mempac\u2019s fixed film reactor (FFR) train; at right, the membrane bioreactor (MBR) train. Spending $3.2 million on a new facility restored 10 years of capacity to West Richland\u2019s 1.5 mgd wastewater treatment plant, which is built around Parkson Corp.\u2019s Biolac sludge-processing technology. As a result, the city has enough sewer capacity for residential and commercial development through 2029. \"\n\t\t\t\t\t\t\tclass=\"lazy-load-image\"\n\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"At left, the Industrial Mempac\u2019s fixed film reactor (FFR) train; at right, the membrane bioreactor (MBR) train. Spending $3.2 million on a new facility restored 10 years of capacity to West Richland\u2019s 1.5 mgd wastewater treatment plant, which is built around Parkson Corp.\u2019s Biolac sludge-processing technology. As a result, the city has enough sewer capacity for residential and commercial development through 2029.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Drew Woodruff\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<div class=\"carousel-slide hidden\"\n\t\t\t\t\tid=\"carousel-slide-5\"\n\t\t\t\t\trole=\"tabpanel\"\n\t\t\t\t\taria-roledescription=\"slide\"\n\t\t\t\t\t\t\t\t\t\taria-label=\"Slide 6 of 6\"\n\t\t\t\t\taria-hidden=\"true\">\n\n\t\t\t\t\t\t\t\t\t\t\t<!-- Lazy load other main images with data-src to be loaded only when needed -->\n\t\t\t\t\t\t<img\n\t\t\t\t\t\t\tsrc=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0349.jpg?w=489\"\n\t\t\t\t\t\t\tsrcset=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0349.jpg 2000w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0349.jpg?resize=300,225 300w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0349.jpg?resize=768,576 768w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0349.jpg?resize=1024,768 1024w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0349.jpg?resize=1536,1152 1536w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0349.jpg?resize=489,367 489w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0349.jpg?resize=236,177 236w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0349.jpg?resize=152,114 152w, https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0349.jpg?resize=175,131 175w\"\n\t\t\t\t\t\t\tsizes=\"(max-width: 489px) 100vw, 489px\"\n\t\t\t\t\t\t\talt=\"The entire wastewater treatment system fits inside a pre-manufactured metal building that was part of the city\u2019s construction contract with Apollo Inc. It was designed by Jamie Lemon of B2 Architecture Inc. in Spokane, Wash., a subconsultant to Wallace Group, the project engineer. In October 2016 the Industrial Wastewater Treatment Plant, or I-Plant, was named 2016 Best Capital Facility Project by Washington\u2019s Infrastructure Assistance Coordinating Council. With representatives from the state\u2019s Commerce and Ecology departments, Public Works Board, and other local agencies attending, the council\u2019s 2009 annual conference helped West Richland\u2019s public works employees identify and successfully obtain funding. \"\n\t\t\t\t\t\t\tclass=\"lazy-load-image\"\n\t\t\t\t\t\t\tloading=\"lazy\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-caption=\"The entire wastewater treatment system fits inside a pre-manufactured metal building that was part of the city\u2019s construction contract with Apollo Inc. It was designed by Jamie Lemon of B2 Architecture Inc. in Spokane, Wash., a subconsultant to Wallace Group, the project engineer. In October 2016 the Industrial Wastewater Treatment Plant, or I-Plant, was named 2016 Best Capital Facility Project by Washington\u2019s Infrastructure Assistance Coordinating Council. With representatives from the state\u2019s Commerce and Ecology departments, Public Works Board, and other local agencies attending, the council\u2019s 2009 annual conference helped West Richland\u2019s public works employees identify and successfully obtain funding.\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-credit=\"Drew Woodruff\"\n\t\t\t\t\t\t\t>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\t<button class=\"carousel-next\"\n\t\t\t\taria-label=\"Next slide\"\n\t\t\t\ttype=\"button\">\n\t\t\t<span class=\"icon\" aria-hidden=\"true\"><\/span>\n\t\t<\/button>\n\t<\/div>\n\n\t<div class=\"carousel-captions-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption active\"\n\t\t\t\t\tid=\"carousel-caption-0\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Jamie Lemon, B2 Architects<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"West Richland (pop. &lt;15,000) Public Works employees, city officials, and Chamber of Commerce celebrate the Oct. 11, 2016, ribbon-cutting of their new wastewater treatment plant. The Washington city took on the $3.2 million project to encourage growth by relieving breweries, creameries, and wineries of the burden of pretreating their effluent. The city received a $2 million low-interest state loan to buy an acre of land and design and build the facility.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tWest Richland (pop. &lt;15,000) Public Works employees, city off&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-0\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-0\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tWest Richland (pop. &lt;15,000) Public Works employees, city officials, and Chamber of Commerce celebrate the Oct. 11, 2016, ribbon-cutting of their new wastewater treatment plant. The Washington city took on the $3.2 million project to encourage growth by relieving breweries, creameries, and wineries of the burden of pretreating their effluent. The city received a $2 million low-interest state loan to buy an acre of land and design and build the facility.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption hidden\"\n\t\t\t\t\tid=\"carousel-caption-1\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Cloacina<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"The consulting team of Wallace Group and J-U-B Engineers chose a 50,000 gpd \u201cpackage\u201d membrane bioreactor (MBR) system manufactured by Cloacina LLC, the largest plant the company\u2019s produced. The Industrial Mempac comprises an influent lift station, screening, influent storage tanks, biological treatment tanks, effluent storage tanks, and solids dewatering and is designed to allow for future expansion.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tThe consulting team of Wallace Group and J-U-B Engineers chose a&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-1\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-1\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tThe consulting team of Wallace Group and J-U-B Engineers chose a 50,000 gpd \u201cpackage\u201d membrane bioreactor (MBR) system manufactured by Cloacina LLC, the largest plant the company\u2019s produced. The Industrial Mempac comprises an influent lift station, screening, influent storage tanks, biological treatment tanks, effluent storage tanks, and solids dewatering and is designed to allow for future expansion.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption hidden\"\n\t\t\t\t\tid=\"carousel-caption-2\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Drew Woodruff<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"The Industrial Mempac wastewater treatment system remotely monitors components and displays the information in near real-time. Operators use the touch-screen control panel to tweak the equipment to optimize treatment. Each main component can be touched on the screen and more detailed information and operational features will be displayed.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tThe Industrial Mempac wastewater treatment system remotely monit&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-2\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-2\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tThe Industrial Mempac wastewater treatment system remotely monitors components and displays the information in near real-time. Operators use the touch-screen control panel to tweak the equipment to optimize treatment. Each main component can be touched on the screen and more detailed information and operational features will be displayed.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption hidden\"\n\t\t\t\t\tid=\"carousel-caption-3\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Drew Woodruff<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"Local contractor Apollo Inc. worked with the design team and Cloacina to finish construction in August 2016, a month before the completion deadline imposed by the $2 million state loan. Since then, the city\u2019s issued a building permit for a new wine-production facility and given several plant tours to the public and consulting companies. These are the Industrial Mempac wastewater treatment system\u2019s fixed film chamber (fixed film reactor train), aeration chamber (membrane bioreactor train) and solids dewatering.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tLocal contractor Apollo Inc. worked with the design team and Clo&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-3\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-3\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tLocal contractor Apollo Inc. worked with the design team and Cloacina to finish construction in August 2016, a month before the completion deadline imposed by the $2 million state loan. Since then, the city\u2019s issued a building permit for a new wine-production facility and given several plant tours to the public and consulting companies. These are the Industrial Mempac wastewater treatment system\u2019s fixed film chamber (fixed film reactor train), aeration chamber (membrane bioreactor train) and solids dewatering.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption hidden\"\n\t\t\t\t\tid=\"carousel-caption-4\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Drew Woodruff<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"At left, the Industrial Mempac\u2019s fixed film reactor (FFR) train; at right, the membrane bioreactor (MBR) train. Spending $3.2 million on a new facility restored 10 years of capacity to West Richland\u2019s 1.5 mgd wastewater treatment plant, which is built around Parkson Corp.\u2019s Biolac sludge-processing technology. As a result, the city has enough sewer capacity for residential and commercial development through 2029.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tAt left, the Industrial Mempac\u2019s fixed film reactor (FFR) trai&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-4\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-4\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tAt left, the Industrial Mempac\u2019s fixed film reactor (FFR) train; at right, the membrane bioreactor (MBR) train. Spending $3.2 million on a new facility restored 10 years of capacity to West Richland\u2019s 1.5 mgd wastewater treatment plant, which is built around Parkson Corp.\u2019s Biolac sludge-processing technology. As a result, the city has enough sewer capacity for residential and commercial development through 2029.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"carousel-caption hidden\"\n\t\t\t\t\tid=\"carousel-caption-5\">\n\t\t\t\t\t<div class=\"carousel-caption__inner\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-credit\">Drew Woodruff<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"image-caption\" data-full-caption=\"The entire wastewater treatment system fits inside a pre-manufactured metal building that was part of the city\u2019s construction contract with Apollo Inc. It was designed by Jamie Lemon of B2 Architecture Inc. in Spokane, Wash., a subconsultant to Wallace Group, the project engineer. In October 2016 the Industrial Wastewater Treatment Plant, or I-Plant, was named 2016 Best Capital Facility Project by Washington\u2019s Infrastructure Assistance Coordinating Council. With representatives from the state\u2019s Commerce and Ecology departments, Public Works Board, and other local agencies attending, the council\u2019s 2009 annual conference helped West Richland\u2019s public works employees identify and successfully obtain funding.\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"caption-preview\">\n\t\t\t\t\t\t\t\t\tThe entire wastewater treatment system fits inside a pre-manufac&#8230;\n\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<button type=\"button\" class=\"read-more-toggle\"\n\t\t\t\t\t\t\t\t\t\t\taria-expanded=\"false\"\n\t\t\t\t\t\t\t\t\t\t\taria-controls=\"caption-full-5\">\n\t\t\t\t\t\t\t\t\t\tRead More\t\t\t\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t<span id=\"caption-full-5\" class=\"full-caption hidden\">\n\t\t\t\t\t\t\t\t\t\tThe entire wastewater treatment system fits inside a pre-manufactured metal building that was part of the city\u2019s construction contract with Apollo Inc. It was designed by Jamie Lemon of B2 Architecture Inc. in Spokane, Wash., a subconsultant to Wallace Group, the project engineer. In October 2016 the Industrial Wastewater Treatment Plant, or I-Plant, was named 2016 Best Capital Facility Project by Washington\u2019s Infrastructure Assistance Coordinating Council. With representatives from the state\u2019s Commerce and Ecology departments, Public Works Board, and other local agencies attending, the council\u2019s 2009 annual conference helped West Richland\u2019s public works employees identify and successfully obtain funding.\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\n\t<div class=\"carousel-thumbnails-wrapper\" role=\"tablist\" aria-label=\"Thumbnail navigation\">\n\t\t<div class=\"carousel-thumbnails\">\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper active\"\n\t\t\t\t\t\tdata-index=\"0\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 1\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-1\"\n\t\t\t\t\t\taria-selected=\"true\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-1586.jpg?w=150&#038;h=150&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper \"\n\t\t\t\t\t\tdata-index=\"1\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 2\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-2\"\n\t\t\t\t\t\taria-selected=\"false\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-westrichland.jpg?w=150&#038;h=150&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper \"\n\t\t\t\t\t\tdata-index=\"2\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 3\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-3\"\n\t\t\t\t\t\taria-selected=\"false\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0339.jpg?w=150&#038;h=150&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper \"\n\t\t\t\t\t\tdata-index=\"3\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 4\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-4\"\n\t\t\t\t\t\taria-selected=\"false\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0342.jpg?w=150&#038;h=150&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper \"\n\t\t\t\t\t\tdata-index=\"4\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 5\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-5\"\n\t\t\t\t\t\taria-selected=\"false\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0348.jpg?w=150&#038;h=150&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t\t\t<button class=\"thumbnail-wrapper \"\n\t\t\t\t\t\tdata-index=\"5\"\n\t\t\t\t\t\t\t\t\t\t\taria-label=\"Go to slide 6\"\n\t\t\t\t\t\taria-controls=\"carousel-slide-6\"\n\t\t\t\t\t\taria-selected=\"false\"\n\t\t\t\t\t\ttype=\"button\"\n\t\t\t\t\t\trole=\"tab\"\n\t\t\t\t>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-content\/uploads\/sites\/10\/2025\/06\/wine-pw-jan17-0349.jpg?w=150&#038;h=150&#038;crop=1\"\n\t\t\t\t\t\taria-hidden=\"true\"\n\t\t\t\t\t\talt=\"\"\n\t\t\t\t\t\tclass=\"thumbnail\">\n\t\t\t\t<\/button>\n\t\t\t\t\t<\/div>\n\t<\/div>\n\n\t<\/div>\n<div class=\"callout align-left\">\n\t\t\t<h3 class=\"callout-title\">\n\t\t\tIndustrial Wastewater Treatment Plant (I-Plant)\t\t<\/h3>\n\t\n\t\t\t<p class=\"callout-text\">\n\t\t\t<b>Who:<\/b> City of West Richland, Wash., Public Works Department<br \/><b>Population<\/b>: 14,340<br \/><b>Service area<\/b>: 22 square miles<br \/><b>Assets:<\/b> 1.5 mgd wastewater treatment plant, three lift stations, 65 miles of piping<br \/><b>Project engineer<\/b>: Wallace Group<br \/><b>Site\/civil design; building, influent and effluent lines:<\/b> J-U-B Engineers<br \/><b>Building design:<\/b> B2 Architecture Inc.<br \/><b>Construction<\/b>: Apollo Inc.<br \/><b>Project cost:<\/b> $3.2 million<br \/><b>Funding<\/b>: $2 million low-interest state loan<br \/><b>Timeline<\/b>: April 2015 to August 2016\t\t<\/p>\n\t<\/div>\n<p class=\"wp-block-paragraph\">Everyone thinks \u201cCalifornia\u201d when someone mentions wine made in the U.S. Yes, the nation\u2019s fourth-largest state produces more wine than any other state. But a neighbor to the north is closing the gap.<\/p><p class=\"wp-block-paragraph\">Since 2009, Washington vintners have contributed more than $1 billion to the state\u2019s economy. The industry\u2019s growing 8.5% a year, making Washington the second\u2010largest wine producing state in the country.<\/p><p class=\"wp-block-paragraph\">Jobs related to grape growing and wine making are at an all-time high. Unfortunately, so are less-desirable consequences of growth. Uninhibited by regulation, each vineyard developed its own practice for wine processing and water\/wastewater treatment. Methods for pretreating winery process wastewater vary from winery to winery.<\/p><p class=\"wp-block-paragraph\">The Washington State Department of Ecology is working on a Winery General Permit for wastewater, but the draft permit won\u2019t be released until March 2017. In the meantime, winery owners are spending large amounts on wastewater evaluations and pretreatment design and construction, each re\u2010inventing the wheel at a premium price. With pretreatment facility costs often exceeding anticipated revenues, producers had four options: don\u2019t pretreat wastewater; move somewhere pretreatment isn\u2019t required; don\u2019t expand operations in Washington; or, when looking to locate a facility, don\u2019t choose Washington.<\/p><p class=\"wp-block-paragraph\">The City of West Richland, population 14,340, is a bedroom community located between the Richland, Kennewick, and Pasco Tri-Cities and world-renowned Red Mountain American Viticulture Area. In 2008, with the U.S. in recession, wineries and tourism were the area\u2019s few economic bright spots.<\/p><p class=\"wp-block-paragraph\">The city is home to three alcohol manufacturers: Vinmotion Wines, which produces 600,000 cases a year; Red Mountain Wine Estates, which produces 165,000 cases; and Black Heron Distillery, southeastern Washington\u2019s first distillery. City leaders wanted to retain these businesses and attract new ones by providing a centrally located facility for treating and disposing of process water. Instead of forcing producers to make major capital investments that could hinder additional growth, they decided to install a city\u2010owned and -operated treatment facility with a designated collection system separate from the city\u2019s sewer infrastructure. <\/p><blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p class=\"wp-block-paragraph\">Even the sweetest wine has waste.<\/p><\/blockquote><p class=\"wp-block-paragraph\">In 2008\/2009, the city\u2019s wastewater treatment plant had been expanded from 0.75 mgd to 1.5 mgd. Even so, the facility couldn\u2019t accommodate additional organic loading without major upgrades. Achieving the city\u2019s goal led to an unconventional collaboration between industry, regulators, and public works that should inspire any community looking to foster growth on a tight budget.<\/p><h3 class=\"wp-block-heading\"><b>It Takes Money to Make Money<\/b><\/h3><p class=\"wp-block-paragraph\">In 1985, Washington\u2019s Commerce Department formed a State Public Works Board and launched the Public Works Trust Fund (PWTF) to provide low-interest revolving loans for infrastructure construction and rehabilitation. Eligible projects must improve health and safety, respond to environmental issues, promote economic development, and\/ or upgrade system performance.<\/p><p class=\"wp-block-paragraph\">An Infrastructure Assistance Coordinating Council (IACC) comprised of state and federal agencies, local government associations, tribes, and nonprofit technical assistance organizations helps local jurisdictions find and access resources like the PWTF. In October 2009, information from the IACC\u2019s annual conference helped West Richland get a $40,000 <a href=\"https:\/\/www.eda.gov\/\" target=\"_blank\">U.S. Commerce Department Economic Development Administration grant<\/a> to study how doubling treatment capacity would affect the local economy.<\/p><p class=\"wp-block-paragraph\">In March 2010, the study found that a dedicated facility that could treat wastewater produced in the manufacture of 2.5 million cases of wine a year and eventually expand to 5 million cases would:<br><\/p><ul class=\"wp-block-list\"><li>Create an estimated 75 direct jobs and 1,185 revenue-generated jobs with an annual payroll totaling $35 million<\/li><li>Generate regional capital investment of $27 million with estimated annual business revenues of $290 million<\/li><li>Raise more than $2 million in a one-time sales tax (during construction) and more than $7 million annually via worker spending<\/li><li>Generate more than $292,000 in annual property taxes for state and local jurisdictions.<p class=\"wp-block-paragraph\"><\/p><\/li><\/ul><p class=\"wp-block-paragraph\">However, the study also confirmed the city\u2019s recently expanded treatment plant would reach capacity in less than 10 years instead of 20 years if it began treating winery wastewater. The patented <a href=\"http:\/\/www.pwmag.com\/water-sewer\/wastewater\/biolac-wastewater-treatment-system-from-parkson_o\" target=\"_blank\">Biolac system<\/a> extends solids retention to create an extremely stable and easily operated sludge-processing system. Introduced by Parkson Corp. of Ft. Lauderdale, Fla., more than 25 years ago, the system\u2019s optimal biochemical oxygen demand (BOD) concentration is 250 mg\/l, not the 7,000 mg\/l typical during winery crush and barrel-racking operations.<\/p><p class=\"wp-block-paragraph\">While not a feasible long-term solution, the existing plant could temporarily handle winery wastewater while the city\u2019s <a href=\"http:\/\/www.pwmag.com\/facilities\/west-richland-street-waste-decant-facility_o\" target=\"_blank\">Public Works Department<\/a> oversaw the design, permitting, and construction of an Industrial Wastewater Treatment Plant (I-Plant).<\/p><p class=\"wp-block-paragraph\">The $3.2 million project was to be located on 20 acres of donated land within a 325-acre industrial and retail park and use aerated lagoons and evaporation ponds for treatment.<\/p><p class=\"wp-block-paragraph\">Funding it became a top strategic focus.<\/p><h3 class=\"wp-block-heading\"><b>Plans Encounter Major Setback<\/b><\/h3><p class=\"wp-block-paragraph\">In May 2010, the city applied for a $2 million PWTF loan. In September 2011, after the application was approved, the city council authorized the loan\u2019s execution. With funding secured, public works prepared to hire an engineering consultant to design the facility.<\/p><p class=\"wp-block-paragraph\">Then they hit a snag.<\/p><p class=\"wp-block-paragraph\">Ownership of the project site had changed between the loan application and execution. After spending more than a year unsuccessfully negotiating with the new property owner, public works moved to Plan B: the Port of Kennewick\u2019s 92-acre former Tri-City Raceway. Public works and port employees worked for another year, but couldn\u2019t overcome one fatal flaw: The property was outside the city\u2019s growth boundary and there wasn\u2019t enough time to change the boundary by the loan\u2019s September 2016 project-completion deadline.<\/p><p class=\"wp-block-paragraph\">Nearly two years had gone by since the loan\u2019s execution. By January 2014, it seemed clear the city would have to return the loan. But the mayor, council, and public works weren\u2019t ready to throw in the towel.<\/p><p class=\"wp-block-paragraph\">During the previous two years, public works employees had toured facilities in northern California that treat winery effluent. Because of high land values, many are on small footprints, typically less than an acre, and use a membrane bioreactor (MBR) or similar technology.<\/p><p class=\"wp-block-paragraph\">Now public works began exploring a similar solution. Preliminary analysis showed the city could acquire land and build an MBR facility within the original $3.2 million project budget that could expand from treating effluent from the annual production of 2.5 million cases to 5 million cases of wine.<\/p><h3 class=\"wp-block-heading\"><b>Momentum Restored<\/b><\/h3><p class=\"wp-block-paragraph\">In June 2014, the city bought an acre of private property in the middle of an undeveloped commercial\/light industrial zone. The new site was superior to the previous site because it expanded the city\u2019s potential gravity-sewer service area from 325 acres to more than 500 acres.<\/p><p class=\"wp-block-paragraph\">With 2-1\/2 years left, a consultant was hired the same month. Selection was based on experience, employee qualifications, and the ability to meet the project\u2019s aggressive deadlines. Unfortunately, the firm couldn\u2019t meet project milestones. The contract was terminated in January 2015 and a new consulting team, <a href=\"http:\/\/www.wallacegroup.us\/\" target=\"_blank\">Wallace Group<\/a> of San Luis Obispo, Calif., and the Kennewick, Wash., office of <a href=\"http:\/\/www.pwmag.com\/facilities\/west-richland-street-waste-decant-facility_o \" target=\"_blank\">J-U-B Engineers<\/a> was hired in April 2015.<\/p><p class=\"wp-block-paragraph\">Because of the tight budget and timeline, public works did a pre-qualification step before design where equipment manufacturers submitted proposals based on a treatment-specification package. The plant\u2019s design was then completed around the selected manufacturer. Equipment was then pre-purchased by the city, rather than the contractor, to save on mark-up. Public works then went through a standard bid process that included an \u201cOwner-Furnished, Contractor-Installed\u201d specification for installation of the manufacturer\u2019s equipment.<\/p><blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p class=\"wp-block-paragraph\">The project relieves wineries of building expensive onsite pretreatment facilities without taxing the municipal wastewater treatment plant.<\/p><\/blockquote><p class=\"wp-block-paragraph\">Cloacina LLC of Arroyo Grande, Calif., was selected. The design team worked on completing construction plans and specifications around the <a href=\"http:\/\/www.pwmag.com\/water-sewer\/wastewater\/industrial-mempac-membrane-bioreactor-from-cloacina_o\" target=\"_blank\">Industrial Mempac<\/a>. The 50,000 gpd \u201cpackage\u201d MBR system includes an influent lift station, screening, influent storage tanks, modular biological treatment tanks, effluent storage tanks, and solids dewatering. All of it fits neatly inside a pre-engineered metal building large enough to double capacity by duplicating the system within an adjoining building. <\/p><p class=\"wp-block-paragraph\">Influent and effluent tanks were incorporated into the design so operators can store and discharge flows at night, when collection system and municipal wastewater treatment plant demands are low.<\/p><p class=\"wp-block-paragraph\">This is a creative solution that maximizes existing asset utilization without negatively impacting its service life.<\/p><p class=\"wp-block-paragraph\">By regaining 10 years of capacity, West Richland\u2019s Biolac Wastewater Treatment Plant can support residential and commercial development through 2029. In addition, the MBR facility\u2019s storage capabilities will enable the city to put treated effluent to beneficial use should it decide to do so in the future.<\/p><h3 class=\"wp-block-heading\"><b>Payback Time!<\/b><\/h3><p class=\"wp-block-paragraph\">Construction was completed Apollo Inc. of Kennewick, Wash., in August 2016, a month before deadline and just in time for the 2016 crush season. Since then, goals outlined in West Richland\u2019s <a href=\"http:\/\/www.westrichland.org\/economic-development\/\" target=\"_blank\">2010 Economic Development Study<\/a> are becoming a reality.<\/p><p class=\"wp-block-paragraph\">Effluent from Vinmotion Wines and Red Mountain Wine Estates was immediately directed to the new plant. Owned by Crimson Wine Group in Napa, Calif., Double Canyon broke ground on a $6 million facility that will ramp up from 40,000 cases to 100,000 cases a year.<\/p>","protected":false},"excerpt":{"rendered":"<p>Everyone thinks \u201cCalifornia\u201d when someone mentions wine made in the U.S. Yes, the nation\u2019s fourth-largest state produces more wine than any other state. But a neighbor to the north is closing the gap. Since 2009, Washington vintners have contributed more than $1 billion to the state\u2019s economy. The industry\u2019s growing 8.5% a year, making Washington [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"scheduledNewsletterDates":[],"_scheduled_newsletter_id":0,"footnotes":"","jetpack_post_was_ever_published":false,"zonda_content_type_url_append":"_o","zonda_dfp_zone":"","zonda_exclude_recommended_contents":false,"zonda_exclude_most_popular":false,"zonda_exclude_tagged_results":false,"zonda_eyebrow":"","zonda_last_newsletter_date":"2099-12-31T23:59:59.999-05:00","zonda_original_url":"","zonda_pdf_version":0,"zonda_print_headline":"","zonda_promo_abstract":"","zonda_promo_headline":"","zonda_promo_image":0,"zonda_subheadline":"In the midst of the Great Recession, a small-town sewer utility found a cost-effective way to help a key industry to keep growing. The community\u2019s reaping the benefits today."},"tags":[],"news_item_type":[780],"section_10":[83124],"subject":[1769,195,14770],"organization":[],"award":[],"person":[],"product_type_10":[],"content-group":[],"event":[],"location":[],"state":[],"brand":[21460],"jlc-category":[],"year_tax":[],"sponsor":[],"coauthors":[88148,88149,88150],"class_list":["post-58323","post","type-post","status-publish","format-standard","hentry","news_item_type-feature","section_10-infrastructure","subject-funding-and-user-fees","subject-technology","subject-wastewater","brand-public-works"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.0 (Yoast SEO v28.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Make Way for Wine<\/title>\n<meta name=\"description\" content=\"In the midst of the Great Recession, a small-town sewer utility found a cost-effective way to help a key industry to keep growing. The community\u2019s reaping the benefits today.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Make Way for Wine\" \/>\n<meta property=\"og:description\" content=\"In the midst of the Great Recession, a small-town sewer utility found a cost-effective way to help a key industry to keep growing. The community\u2019s reaping the benefits today.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o\/\" \/>\n<meta property=\"og:site_name\" content=\"Concrete Construction Magazine\" \/>\n<meta property=\"article:published_time\" content=\"2016-12-21T22:18:32+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"7 minutes\" \/>\n\t<meta name=\"twitter:label2\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data2\" content=\"Shannon Jessica, Robert Miller, Drew Woodruff\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/make-way-for-wine_o#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/make-way-for-wine_o\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Make Way for Wine\",\"datePublished\":\"2016-12-21T22:18:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/make-way-for-wine_o\\\/\"},\"wordCount\":1462,\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/make-way-for-wine_o\\\/\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/make-way-for-wine_o\",\"name\":\"Make Way for Wine\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/#website\"},\"datePublished\":\"2016-12-21T22:18:32+00:00\",\"author\":{\"@id\":\"\"},\"description\":\"In the midst of the Great Recession, a small-town sewer utility found a cost-effective way to help a key industry to keep growing. The community\u2019s reaping the benefits today.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/make-way-for-wine_o#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/make-way-for-wine_o\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/projects\\\/infrastructure\\\/make-way-for-wine_o#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Make Way for Wine\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/#website\",\"url\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/\",\"name\":\"Concrete Construction Magazine\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zonda-develop.go-vip.net\\\/concrete-construction\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Make Way for Wine","description":"In the midst of the Great Recession, a small-town sewer utility found a cost-effective way to help a key industry to keep growing. The community\u2019s reaping the benefits today.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o","og_locale":"en_US","og_type":"article","og_title":"Make Way for Wine","og_description":"In the midst of the Great Recession, a small-town sewer utility found a cost-effective way to help a key industry to keep growing. The community\u2019s reaping the benefits today.","og_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o\/","og_site_name":"Concrete Construction Magazine","article_published_time":"2016-12-21T22:18:32+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"7 minutes","Written by":"Shannon Jessica, Robert Miller, Drew Woodruff"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o#article","isPartOf":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o\/"},"author":{"name":"","@id":""},"headline":"Make Way for Wine","datePublished":"2016-12-21T22:18:32+00:00","mainEntityOfPage":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o\/"},"wordCount":1462,"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o\/","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o","name":"Make Way for Wine","isPartOf":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/#website"},"datePublished":"2016-12-21T22:18:32+00:00","author":{"@id":""},"description":"In the midst of the Great Recession, a small-town sewer utility found a cost-effective way to help a key industry to keep growing. The community\u2019s reaping the benefits today.","breadcrumb":{"@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/projects\/infrastructure\/make-way-for-wine_o#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/"},{"@type":"ListItem","position":2,"name":"Make Way for Wine"}]},{"@type":"WebSite","@id":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/#website","url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/","name":"Concrete Construction Magazine","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"jetpack_sharing_enabled":true,"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Concrete Construction Magazine","distributor_original_site_url":"https:\/\/zonda-develop.go-vip.net\/concrete-construction","push-errors":false,"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts\/58323","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/comments?post=58323"}],"version-history":[{"count":0,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/posts\/58323\/revisions"}],"wp:attachment":[{"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/media?parent=58323"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/tags?post=58323"},{"taxonomy":"news_item_type","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/news_item_type?post=58323"},{"taxonomy":"section_10","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/section_10?post=58323"},{"taxonomy":"subject","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/subject?post=58323"},{"taxonomy":"organization","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/organization?post=58323"},{"taxonomy":"award","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/award?post=58323"},{"taxonomy":"person","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/person?post=58323"},{"taxonomy":"product_type_10","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/product_type_10?post=58323"},{"taxonomy":"content-group","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/content-group?post=58323"},{"taxonomy":"event","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/event?post=58323"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/location?post=58323"},{"taxonomy":"state","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/state?post=58323"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/brand?post=58323"},{"taxonomy":"jlc-category","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/jlc-category?post=58323"},{"taxonomy":"year_tax","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/year_tax?post=58323"},{"taxonomy":"sponsor","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/sponsor?post=58323"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/zonda-develop.go-vip.net\/concrete-construction\/wp-json\/wp\/v2\/coauthors?post=58323"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}