Road and bridge engineers have long relied on the tensile strength of steel to complement concrete’s significant compressive strength and thereby increase an asset’s overall durability. The same principle — reinforcing concrete with steel to increase structural flexibility — has been deployed in the water and sewer industries for almost the same amount of time in the form of concrete pressure pipe (CPP).

This gives concrete pressure pipe one of the longest performance histories and lowest failure rates of any pipe material. Concrete pressure pipe is highly customizable (see chart below), enabling engineers to tackle tight spaces, long stretches of hilly terrain, and precise sequencing requirements without special bedding and backfill procedures. Operators like the pipe as it requires little maintenance over 70-, 80-, and even 90-year-or-more time spans. The pipe is available as:

Water Transmission

Who: Canyon Regional Water Authority, New Braunfels, Texas Engineer: River City Engineering, New Braunfels Contractor: Mountain Cascade Inc., Mansfield, Texas Material: B-303 bar-wrapped concrete cylinder pipe

Canyon Regional Water Authority managers specified 46,000 feet of 30-inch B-303 bar-wrapped concrete cylinder pipe to connect two pipelines because an existing concrete pressure pipeline has performed well over time. Customized fittings accommodated the service area’s hilly, sometimes steep, terrain. Introduced in 1973 by one of Hanson Pressure Pipe’s legacy companies, Snap Ring restrained joints eliminated the need for field-welding during installation.

The steel components are electrochemically protected from corrosion by a high-pH portland cement mortar coating.

The steel cylinder is lined with centrifugally applied mortar or concrete. Mild steel reinforcing bar is helically wound around the outside of the cylinder under controlled spacing and tied off to the steel joint rings. Lastly, a coating of dense portland cement mortar is applied to the pipe exterior for both physical and corrosion protection.

B-303 allows for easy modifications — adding an outlet, making service taps, and performing simple repairs — in the field.

How to assess risk

Utilized for water/wastewater applications in 90 of North America’s 100 largest metropolitan areas, concrete pressure pipe has one of the lowest rates of failure when compared to other pipe products.

In fact, at last year’s American Society of Civil Engineers Pipelines Conference, researchers shared their analysis of 10 years of performance data. Their technical paper reported that, based on the electromagnetic and acoustic inspections of 118,808 pipe sections (about 2.1 million feet), only 3.9% had electromagnetic signatures consistent with prestressing wire break damage. The rest, according to “Numbers Don’t Lie: PCCP Performance and Deterioration Based on a Statistical Review of a Decade of Condition Assessment Data,” were in “like new” condition.

System and Plant Expansion

Who: City of Bloomington, Ind., Utilities Department Contractor, water transmission main: Howell Contractors Inc.; Fort Wright, Ky. Contractor, treatment plant upgrade: F.A. Wilhelm Construction Co.; Indianapolis Material: L-301 prestressed concrete cylinder pipe (PCCP)

The Southeast Water System Improvement project expanded treatment capacity from 24 mgd to 30 mgd by adding 2 million gallons of storage; a 12 mgd booster station with expansion slots; and 44,000 linear feet of 24- and 36-inch L-301 prestressed concrete lined cylinder pipe (PCCP). The new water main from the plant parallels a 36-inch pipeline along a ridgeline for about half its length before diverging. Bloomington, Ind., Utilities Department managers chose prestressed concrete because it was cost competitive with the other material they were considering, ductile iron, and historical precedence: The existing 36-inch concrete pressure pipeline has provided uninterrupted service since 1967.

Still, some city engineers have concerns about the material stemming from a few high-profile failures of Interpace Corp. product, installed primarily in the East, as well as other failures occurring in the West and other parts of the country. These were caused by the effects of aggressive corrosive soils during the 1970s.

Investigations of the Interpace pipe revealed that a significant majority was made with faulty Class IV prestressing wire and Grade E cold-rolled steel cylinders. The industry learned a significant amount from the forensic investigations of these failures and, as a result, the American Water Works Association (AWWA) standard governing the pipe’s manufacture was significantly improved. A new design standard takes advantage of computerized finite element analysis techniques and up-to-date mechanical characteristics of the constituent materials. Another positive result has been the introduction of condition assessment for PCCP, making it the only pipe material that can be accurately assessed.

Though Interpace is no longer in business, utilities with the defective pipe are successfully managing those lines by assessing and analyzing the pipe and repairing or replacing sections as needed.

Before signing on for an assessment, it’s important to do a little research and ask a few questions with the help of any concrete pressure pipe manufacturer.

10 ways to ensure longevity

Sewage Tunnel

Who: Milwaukee Metropolitan Sewerage District Contractors: J.F. Shea Construction Inc., Kenny Construction Co., Northbrook, Ill. Material: L-301 and E-301 prestressed concrete cylinder pipe (PCCP)

The Milwaukee Metropolitan Sewerage District implemented the Harbor Siphons project so wastewater diverted to a deep tunnel system could be directly transferred to the Jones Island Wastewater Treatment Plant. Crews drove shafts 300 feet deep into the harbor connecting to Lake Michigan, tunneled under the riverbed and an island and then back up into the plant. In addition to L-301 and E-301 prestressed concrete pressure pipe (PCCP) in seven sizes ranging from 42 inches to 96 inches, the shafts and tunnels required custom-designed fittings, mechanically restrained dual rubber O-rings that allow joints to be air-tested immediately after installation, and specially designed lifting lugs.

For new lines, longevity relies on proper handling and installation. Though the pipes are durable, damage during installation can lead to problems down the road. To ensure pipes reach their maximum life span, project managers should:

—Rick Deremiah (rick.deremiah@hanson.biz) is technical resources engineering manager for Hanson Pressure Pipe (www.hansonpressurepipe.com). He’s been involved in the concrete pressure pipe industry for more than 35 years.

About the Author