Dual-purpose epoxy
A new anti-icing and anti-skid pavement overlay system protects roads and bridges while reducing accidents.
5 MIN READ
Above: During installation, aggregate is immediately shoveled across the surface once the epoxy has been applied. Facing page: The initial coat of epoxy is applied at approximately 1/16 inch or about 3 gallons per 100 square feet. Aggregate is shoveled onto the epoxy. Then, a second coat is applied following the same protocol, but at a thicker rate. The final profile is about 3/8-inch thick. Photos: Kirk Duffy, Cargill Inc.